Hello, Im from 2200, Phase 2 of 2nd ave subway hasnt been built Queensway got built With no space for trains Williamsburg and Manhattan bridges have collapsed Utica Ave Subway got rejected Nothing has been built for the subway the R46 Hasnt retired yet The ship that was transporting the R262s sinked M and R Train service got worse
their is no direct connection betwen the liirr far rock way station and the subway a sta platforms at far rickway mott avenuse as yhier is a large mall their as part of the extension of the m ifany other investment is required they should build new station onder the mall that would provide cross platform connection between the two service if not even a few though tracks. so rebuilt rockway park line coildmaybe run thougth trains to long island.
It's alright! In this program, I mainly used audio from Mr Railfan's D train via Far Rockaway and V train programs. It's hard to explain the exact parts I used, because I use tons of recordings from different places and edit them all together to create programs. If you want a guide on how I make announcement videos in general, I have a video on it: ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-RT0uKJmjhPY.html
We need Queenslink. Mayor Adams doesn't know what he's talking about about when he said Queens has enough subway lines. Queens doesn't have enough subway lines and Queenslink would definitely help.
Yep, he actually said that in one of his press conferences when he was promoting Queensway. And what's really funny is that he went to BAYSIDE HIGH SCHOOL when he was younger.
We need a mayor like Moscow mayor who supports public transport so much ever since he became the mayor 150 subway stations have been built in moscow( he became mayor in 2010)
@ggbmta17 Not at all, but Queenslink is unpopular due to the unreliability of QBL. The F/M swap allows for better service on the congested corridor for Rockaway customers and the existing customers.
@@ggbmta17why you didnt do with the F/M Swap like starting from Lex 63rd or 57th Since Vashnookenragan one of the main people behind The Queenslink heavily wants the F&M Swap To Happen
Nah just keep the original plan and have the M train run to Rockaway park so Far Rockaway and lefferts get more capacity if some 59th street Deinterling is put through the A train can run 16 ish trains per hours meaning abiut 8 trains per hour on far Rockaway and Lefferts
@@omarfaruq9233 the 59 St Deinterlining can have the A and C run at least 30tph and 36tph with the SAS taking the local tracks on Fulton. With that the A runs 18tph to Far Rockaway and the C runs 18tph to Lefferts. The 8tph on each branch alone would be an improvement over what we have now.
Do the Queens Link announcements of the (M) Train to Rockaway Park next, via 53rd Street. When you get a chance. I hope the (M) Train should operate in the Rockaway Branch to extend to The Rockaway's in the future.
It would have to run 24/7 as the M would have a stronger purpose of its existence. Either that or the G can run on the segment on late nights and Weekends.