Hello Mr. John, excellent video, thank you very much for sharing it. I have a question, when you configure the time of concentration for the post development you only configure the sheet flow and the shallow concentrated flow but you do not consider the 5 minutes of channeled flow from the road to reach the pond, the total time shown in the tab The report is 12.64 but you do not consider the 5 minutes of channeled flow, is it something you forget or is it not really considered? Thanks in advance
Really great but I wish the pond outflow had options like Hydraflow extension where you can make adjustments and see in real time the outflow conditions for each storm event
Thank you for this great video just have the following question concerning the sub base entry why the average was checked instead of the weighted average (area percent ) or one of the of the other options thank you again
Thanks for the video. I realize this is an older video but thought maybe it could help you to tell you a mistake I have made with conversions imperial/metric and state plane. Be careful with your imperial to metric conversion. using .3048 you're using international foot conversion not US foot or survey foot. on small numbers it doesn't make much difference but large numbers like state plane coordinates it makes big differences. Here in Oklahoma it makes about a 4 foot difference. lesson learned the hard way
After setting up SSA and run the analysis, I get the error message "INF is not a valid floating point number." Any idea how to fix this problem? Thank you.
Good information, do you created any Technology based Civil 3d video, Like Electrical power cabinet, Electrical Duct & 3D asset tagging. Please upload if you have , thanks @john Sayre
Hi John, Thank you for the video. Is there any way to design for the 1:200 year storm event using the rainfall designer? I noticed that it ends on 1:100 and I would like to analyse other return periods.
Hi John, Please how did you get your external flow to be 3 CFS? Did you get it from the run-off discharge? Which rainfall return period did you use? Thank you.
Hi there nice informative video. I am struggling to edit projection and crossing of solids in my sections. how to turn them off together for whole section groups ?