sir, After wet preservation of boiler. can i remove all the chemical water before start the boiler. or drain water upto 50% of steam drum then start the boiler. please confirm which on is good.
Hi. Can anyone tell me that if GAD is approved by IBR inspector, and quantity mentioned in GAD is only one. Than can manufacturer make more than one component based on that same IBR approved GAD? Please let me know. It would be very helpful for me.
Many thanks for post. 🎉 in numerical-2, do we need to consider mass flow rate of Flue gas instead of coal glow rate whe calculating chimney dia. since flue gas produced per kg of coal is 14 ??