Dont you have to set your zero before your span? Meaning it would be better to set zero, apply pressure, remove pressure and see how close it gets back to zero again before ever doing span? Basically repeat the zero set point until it is correct then move on to span to save half of the steps but make it accurate?
Hi that’s a good example, that was for the complete configuration of the tben module , you don’t have to do that for each port do you . If you wanted the rslogix 5000 to automatically download the configuration to the tben module if it got changed due to failure is that possible