Capital cost Expenses for planning and designing Minimum 10 yrs of future req Land and preparation of site(road, rail) Building Plant equipment Testing of equipment Fixed cost Annual cost Interest Insurance Taxes
i wonder how come you are assistant professor in walchand institue of technology with such pathetic teaching skills.... And i am now imagining the condition of the students u are teaching....
(a) Determine the economic operating cost for this 3 units when delivering a total load of 850MW. The fuel cost for unit 1 is 1.1N/MBTU, unit 2 is 1.0N/MBTU and unit 3 is 1.0N/MBTU. (b). Assume the price of coal decrease to 0.9N/MBTU in the system (i) above. Determine the economic operating cost.