Still using the old system in this modern world. Send this team to the US to learn new techniques and see modern day equipment in action to do this major part of construction correctly.
Great Explanation. Please check out our channel PSC girder fabrication at Puneeth Engineering Fabrication Works: ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-NLXbLW8xo7I.html We are fully equipped with a wide range of machinery to provide Fabrication of PSC Girders (I-Girders, U-Girders, etc), All Types of Centring Plates (Plain & Curved), Cribs, Brackets, Stay Rods, Crash-Barriers, Tie Rods, U-Jacks, Prop-Jacks, etc. For more details visit our Google Business Page: g.page/puneethengineering?gm Location: goo.gl/maps/2oRQGbqEmrGV1X6f7
So much background noise... this can not be good and the pollution so many weird vehicles produce. Ban the polluting vehicles and you will not need the new road.
Robotic post tension tendon inspections peer through concrete and steel -www.infrastructurepc.com/post-tension-tendon-inspection-services-keep-our-nations-bridges-safe/
Thank you for the videos! I understand grouting the tendons' conduit helps with corrosion, but how can conduit grout transfer any post-tensioning loads to body of beam if grout is injected after tendon tensioning/clamping? Or is a grouted tendon only counteracting live loads generated after project is completed? Thank you.