We, Manjula Dhevi Murugesan Software Training Centre are providing training in Revit MEP, SmartPlant 3D (SP3D), Plant Design Management System (PDMS), Everything 3D (E3D), AutoCAD Plant 3D, AutoCAD P&ID, Autodesk Inventor, Revit Architecture, Revit Structure. Revit Mechanical, HVAC
Training is available both in Online mode and Offline mode.
Language: Tamil and English
We provide Hands-on Material and Certificate on completion of training.
For training requirement contact: +91 94988 10923 / + 91 94988 10923
Revit calculation differ from manual calculation cfm also differ like 900 sq.ft it showing 700 cfm how this is enough to reject the heat from comfort zone.
Always cooling load calculated using software will more accurate than manual calculation. But in Revit you need to select proper wall, roofs etc proper material with thermal resistance.
Sir, if it so then Air terminals placing also done by ARCHITECT at detail design level ahh ? Or we place Air terminals as per our design in Reflected Ceiling Plan drawing and to get approval from architect ahh sir ?
This is super helpful, Thanks. But when I create a VAV schedule I would like to see both the VAV equipment location and the service location (like the Air Terminal it is connected to). May I know how is this possible?
Sir, what is the minimum distance to be maintained between supply air and return air diffuser/grille? And also minimum distance to be maintained between fresh air intake and exhaust outside?