The Ahmedabad Metro Rail Project is a monumental boost to multimodal infrastructure connectivity. Phase-I of the Ahmedabad Metro project comprises about 39 km of the East-West corridor from Apparel Park to Thaltej and the North-South corridor between Motera to APMC. The Thaltej-Vastral route in the East-West corridor has 16 stations. This corridor also has a 6.6 km underground section with four stations. The 19 km North-South corridor that connects APMC to Motera Stadium has 15 stations. The entire Phase 1 project is built at a cost of more than ₹12,900 crores. This metro corridor will have 96 coaches, 129 elevators, 161 escalators, and 126 entry/exit points.
#AhmedabadMetro
#ahmedabadmetrophase1
#giftcity
#AhmedabadMetroPhase2
#PMNarendraModi
#kazhakootamflyover
#Nh66
#MetroRailProjectsinIndia
#MumbaiAhmedabadbullettrain
#Ahmedabadcity
Follow Us on Instagram
/ hindrises
Join Our Telegram Group
t.me/hindrises
21 окт 2024