Here is a detailed breakdown of construction costs for different types of construction of 10 Marla house based on the number of storeys, the square footage of each floor, and the type of finish (grey structure, A-quality finishing, premium quality finishing).
Single Storey House:
For a house with only one storey (ground floor):
Grey Structure: 2,340,000 PKR
A-Quality Finishing: 3,150,000 PKR
Premium Quality Finishing: 3,870,000 PKR
Total construction costs range from 5,490,000 PKR (grey structure) to 6,210,000 PKR (premium quality finishing).
Double Storey House (Basement + Ground):
For a house with a basement and a ground floor:
Grey Structure: 4,990,000 PKR
A-Quality Finishing: 6,300,000 PKR
Premium Quality Finishing: 8,020,000 PKR
Total costs range from 10,110,000 PKR to 11,370,000 PKR.
Double Storey House (Ground + First Floor):
For a house with a ground and first floor:
Grey Structure: 4,200,000 PKR
A-Quality Finishing: 5,250,000 PKR
Premium Quality Finishing: 7,180,000 PKR
The total cost for this type ranges from 8,470,000 PKR to 10,730,000 PKR.
Triple Storey House (Basement + Ground + First Floor):
For a house with a basement, ground floor, and first floor:
Grey Structure: 7,350,000 PKR
A-Quality Finishing: 9,450,000 PKR
Premium Quality Finishing: 12,460,000 PKR
The total cost for this house type ranges from 15,630,000 PKR to 19,140,000 PKR.
Triple Storey House (Ground + First + Second Floor):
For a house with a ground, first, and second floor:
Grey Structure: 5,490,000 PKR
A-Quality Finishing: 8,400,000 PKR
Premium Quality Finishing: 10,620,000 PKR
The total cost ranges from 11,640,000 PKR to 16,640,000 PKR.
Four Storey House (Basement + Ground + First + Second):
For a house with a basement, ground, first, and second floor:
Grey Structure: 9,840,000 PKR
A-Quality Finishing: 15,510,000 PKR
Premium Quality Finishing: 20,460,000 PKR
The total cost ranges from 20,460,000 PKR to 28,640,000 PKR.
Web: gharplans.pk/
Facebook: / gharplanspk
twitter: / gharplanspak
Pinterest: / gharplanspakist
Instagram: www.instagram....
15 окт 2024