Тёмный

(2023) Complete Sound Transit Link Line 1 Ride - Angle Lake to Northgate 

UpLift Vancouver
Подписаться 2,6 тыс.
Просмотров 7 тыс.
50% 1

Опубликовано:

 

22 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 16   
@guinessbeer
@guinessbeer 9 месяцев назад
Very cool system. Seems to function more like a metro.
@hobog
@hobog 7 месяцев назад
29:00 the money shot of Seattle's skyline is on the other side here
@realquadmoo
@realquadmoo 9 месяцев назад
Oh it's so refreshing to hear the old train audio before they changed it.
@swedishfierce4042
@swedishfierce4042 8 месяцев назад
Before they lowered the pitch
@realquadmoo
@realquadmoo 8 месяцев назад
@@swedishfierce4042 They re-generated the announcements. The new ones are what it can sound like with minimum alterations. The old ones were heavily modified.
@jamallhayden2512
@jamallhayden2512 8 месяцев назад
Thank You!
@babymonster206
@babymonster206 6 месяцев назад
Great 👍🏿 video
@crayolakid456
@crayolakid456 9 месяцев назад
i havent riden the link in years hope to ride it to lynwood this spring. hope the lynwood station is close to alderwood mall
@realquadmoo
@realquadmoo 9 месяцев назад
Yeah Google says it's about an hour walk. (I'm pretty disappointed that they put the alignment on I-5, but no, doesn't look like it is within walking distance.) You can take routes 107, 113, 115, 116, 196, and 535 though.
@TheTikeySauce
@TheTikeySauce 9 месяцев назад
It's still a bit a ways. Alderwood Mall will get its own station but it's planned to be part of the Everett Link Extension, not the Lynnwood extension.
@aandersen93
@aandersen93 6 месяцев назад
At 40:33 you can see where the part of the DSTT that originally went to the convention center that is now no longer used. I would love to just see if they use that stub of the tunnel for anything now or if it just sits empty and is walled up at the end.
@ed4409
@ed4409 2 месяца назад
I am assuming that after the 2 Line connects Bellevue to Seattle, it'll continue going on the 1 Line path until it splits off after leaving Westlake to a new path (or even the 1 Line splits off to that tunnel and the 2 Line continues on to Northgate/Lynnwood).
@gluse
@gluse 9 месяцев назад
Cool! Would you be able to film the entire sound light rail system at the very front where you can aim your camera through the driver's cab door window?
@UpLiftVancouver
@UpLiftVancouver 9 месяцев назад
I wasn't able to unfortunately, a lot of the drivers like to keep the blinds down over the window in the door to minimize glare.
@dulljumbo4321
@dulljumbo4321 5 месяцев назад
why any of this is at grade will forever baffle me
@Brennan-np3pw
@Brennan-np3pw 5 месяцев назад
Don't know what to say.
Далее
Link 1 Line | Angle Lake to Northgate
57:05
Просмотров 15 тыс.
impossible lungs test !! 🫁
01:00
Просмотров 3,2 млн
These Are Too Smooth 😮‍💨
00:57
Просмотров 6 млн
▼ ЕДУ В ТИХОСРАНСК 💪
37:00
Просмотров 237 тыс.
Seattle is Building a $54BN New Railway
8:47
Просмотров 1,1 млн
Riding LINK Light Rail in Seattle for the First Time
10:55
impossible lungs test !! 🫁
01:00
Просмотров 3,2 млн