Тёмный

705.11 Connections to a Service 

Ryan Jackson
Подписаться 30 тыс.
Просмотров 3,4 тыс.
50% 1

The rules for connecting parralellel power production sources (such as PV) to a service were clarified.

Наука

Опубликовано:

 

27 июл 2023

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 18   
@iaov
@iaov Год назад
Since I found your channel Ryan I no longer watch Mike Holt. Your explanations are clear and fun!!
@danielbell4595
@danielbell4595 2 месяца назад
Excellent Content! The examples are very helpful. Thanks for sharing your knowledge.
@jimmiegill3981
@jimmiegill3981 Год назад
Glad you can figure all this out!
@user-xc3jy5by6d
@user-xc3jy5by6d 7 месяцев назад
Love watching your videos Ryan and have a lot of respect and admiration towards you. Being on the AHJ side of the fence we have always required the disconnects to be grouped per 230.72(A). I agree with everything except it being a separate service but for arguments sake we'll say it is. My question, would not every separate single family dwelling service require an emergency disconnect? If so 230.85(A)3 would apply correct? Please share your thoughts. Our whole reasoning is to direct a first responder to a single location to shut off all power to the structure.
@brianfisher6799
@brianfisher6799 11 месяцев назад
Good catch on 8 vs 4 aluminum
@TheTubejunky
@TheTubejunky 11 дней назад
Line side taps are usually connected via IPC s inside of the home's main panel. Those then feed a fused disconnect next to the panel then travel outside to an unfused disconnect for the fire department per NFPA required location with signage. That then feeds the solar combiner with the strings of each array of panels.
@TheTubejunky
@TheTubejunky 11 дней назад
Those taps or IPC s ARE REQUIRED TO BE SERVICE RATED AS WELL AS UL LISTED. I DO BELIEVE THE SR LABELING on the IPCs STANDS FOR SERVICE RATED.*
@AllAroundHnadyMan
@AllAroundHnadyMan Год назад
Thank you
@keything8487
@keything8487 8 месяцев назад
thank you for the info ! if i may ask; treating it as a separate service disconnect would mean bonding the disconnect as you stated, but also grounding it likewise. so another ground rod(s), grounding rod conductor, or would that tie into the "main"/original grounding electrode conductor? i hear the term ground(ing) loop thrown around all the time when it comes to inter-active solar installations. btw, im hooked on these videos !!
@patrickg7569
@patrickg7569 Год назад
Audio is very low
@saltyroe3179
@saltyroe3179 Год назад
Still trying to figure out how to add PV that doesn't ever feed the utility. My local utility makes it confiscatory to feed power to them when generating more PV than used. Is that covered in 690?
@keything8487
@keything8487 8 месяцев назад
confiscatory = meaning what? they take your system away?
@TheTubejunky
@TheTubejunky 11 дней назад
​@@keything8487no they take the generated power you don't use and don't pay you for it. You're supplying them with free electricity (well actually your neighbors)
@jimmiegill3981
@jimmiegill3981 Год назад
I was just thinking that is backwards
@TheTubejunky
@TheTubejunky 11 дней назад
Those line side taps HAVE TO BE FUSED and cannot extend further than Ten feet. Inspectors have said this.
@RyanJacksonElectrical
@RyanJacksonElectrical 11 дней назад
@@TheTubejunky And they're wrong.
@TheTubejunky
@TheTubejunky 11 дней назад
@@RyanJacksonElectrical Could you please advise on what to tell them in the future?
@RyanJacksonElectrical
@RyanJacksonElectrical 11 дней назад
@@TheTubejunky There is no length limit, and they can be protected on their load side by a breaker or a fuse. You treat them like service conductors because they ARE service conductors.
Далее
Article 712 DC Microgrids
2:16
Просмотров 968
How To Install A Generator Interlock Kit
9:40
Просмотров 253 тыс.
Article 724 Class 1 Circuits
13:03
Просмотров 2,3 тыс.
700.5 Transfer Equipment (emergency systems)
8:04
Просмотров 1,4 тыс.
Using 2 antennas AND a duplexer? Why?
10:43
Solar Line Side Tap Connection
3:58
Просмотров 24 тыс.
2023 230.85 Emergency Disconnect
15:19
Просмотров 8 тыс.
750.30 Load Management
10:34
Просмотров 1,6 тыс.