A High Pressure Exchange 

Deep South Crane & Rigging
Подписаться 593
Просмотров 941
50% 1

Assembling the 1,500T VersaCrane™ TC-24000 off-site and moving it via SPMT saved this client 15 days of downtime and allowed the refinery unit to run at full capacity until unit shutdown. During the scheduled outage, Deep South was tasked to replace two coke drums, each weighing 452,800 lbs and were 19’-2” outside diameter and 96’-0” long and were comparable in size and weight to the old drums.
Read more about this project here: deepsouthcrane...

Опубликовано:

 

11 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 1   
@jpgloanec7601
@jpgloanec7601 29 дней назад
C'est du costaud avec une entreprise qui a plus que du vécu .Ce ne sont pas des charlots .
Далее
The Hidden Engineering of Landfills
17:04
Просмотров 3 млн
Biggest Megaprojects Under Construction in 2024
20:25
Дежавю, прескевю и жамевю!
00:59
Mohammad bin Salman: Prince With Two Faces
54:00
Просмотров 6 млн
Dangote Petroleum Refinery & Petrochemicals Documentary
22:36
Introducing Mammoet's PTC210-DS
3:17
Просмотров 136 тыс.
Legendary Lorry Challenge | Top Gear Classic
14:06
Просмотров 1,3 млн
Electromagnetic Aircraft Launcher
15:09
Просмотров 1,3 млн
How Do You Steer a Drill Below The Earth?
14:53
Просмотров 4,2 млн