The TXGJ-315C intelligent arch frame trolley is a new type of tunnel construction equipment developed by our company, which has multiple functions and uses, including arch frame installation, anchor rod mesh installation, steel mesh laying, auxiliary drilling, loading, handling underexcavation operations, auxiliary quality inspection, wind and water pipe installation, and defect repair. By adopting a new arch installation technology, 2-3 prefabricated welded arches can be installed in a single operation, truly solving the problems of traditional manual scaffolding construction time being too long, personnel labor intensity being high, and high danger, meeting the requirements of mechanized and rapid construction.
We are a professional manufacturer specializing in the machine construction of mine tunnels, railways, highways, urban subways, slope engineering, water conservancy and electricity and other engineering projects. Our main business: shotcrete machine, grouting machine,rock drilling jumbo, concrete spraying unit, concrete conveying pump,mortar pump, tunnel construction platform,etc.
For more information, welcome to visit our website:www.hnwbzn.com,
Pls contact us:
Phone and WhatsApp:+8615937117592
Email: info@hnwbzn.com
9 июл 2024