Тёмный

ARE Live: Project Management Mock Exam - 2020 

Black Spectacles
Подписаться 24 тыс.
Просмотров 16 тыс.
50% 1

Join Black Spectacles and architect Mike Newman for our Project Management mock exam. With these practice questions, we will explore issues related to resource management, project work planning, project execution, and project quality control.

Опубликовано:

 

18 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 11   
@arqmiryam
@arqmiryam 3 года назад
Thanks to clarify NCARB world vs reallity.
@homwou77
@homwou77 3 года назад
Question 5 is kind of obscure and missing a lot of context. You're supposed to assume a very specific scenario in order to arrive at that answer since they don't give you the specifics about context. Obviously if a contractor calls you during the bid phase it's true you shouldn't give them exclusive clarification/information on the design intent that the other contractors don't have, but even if you did answer that one contractor you'd just have to make sure that that information was made available to the other contractors. With the lack of context provided, would it be wrong to assume that the architect would follow up with the other contractors and provide them with the same information hence making answer a correct? Feel like the question was more difficult to decode/interpret than knowing the actual information and concept that it was meant to test you on. Notice many ARE questions fall into this category.
@GJ_DM
@GJ_DM 2 года назад
yeah pretty ridiculous answer, I would never not give a contractor an answer to an issue or problem. Even if it's a bidding question, I answer it, then distribute the question and answer to the other bidders. I have been instructed by my boss to do this. These guys live in fairy land and clearly don't practice Architecture. If I refused to work with the contractor like that the owner would likely not want to work with me anymore, it's a team effort. The contractor and the architect are not enemies, at least not a functional job. These guys must be super toxic to work with.
@CT15GamerOffical
@CT15GamerOffical 3 года назад
25 min to explain the first problem and we get 2.5 min to answer it. Way to much, Mr Newman. Way to much. Dont say 100 words when 20 will do.
@DrgnTmrSirGawain
@DrgnTmrSirGawain 6 месяцев назад
its more like 1.5 min
@natesauter6750
@natesauter6750 2 года назад
I thought supplemental services are services not covered under the basic services, and add services are essentially more basic services than covered in the contract. For example, if a project is delayed and needs many design alternatives due to owner indecision, the architect could possibly request an add service to cover the extra basic services that were above and beyond what's required in the contract.
@MixedMediaReviewsPodcast
@MixedMediaReviewsPodcast 2 года назад
Yeah, I thought the difference between supplemental/additional was basically timing. Supplemental services are outside Basic at time of contract. Additional is anything added after the contract is signed.
@calliope7479
@calliope7479 2 года назад
This is my understanding as well, see Article 4.1 versus 4.2 in the B101 contract.
@calliope7479
@calliope7479 2 года назад
Didn’t use the word “profit” once while discussing the net multiplier!
@suhuang974
@suhuang974 4 года назад
Thank you so sharing!
@ctrlaable
@ctrlaable 2 года назад
Sooo wordy...
Далее
ARE Live: Practice Management Mock Exam
1:00:48
Просмотров 18 тыс.
ARE Live: Construction & Evaluation Mock Exam 2021
1:02:15
ARE Live: Project Management Mock Exam - 2018
58:32
Просмотров 10 тыс.
ARE Live: Project Management Mock Exam Review
1:09:07
Просмотров 26 тыс.
ARE Live: Project Planning & Design Mock Exam 2020
1:07:19
ARE Live: Programming & Analysis Mock Exam - 2020
1:01:06
ARE Live: Construction & Evaluation Mock Exam - 2019
39:06
ARE Live: Navigating Practice Management
59:32
Просмотров 18 тыс.
Project Management FLASHCARDS 1/3...😇😇
36:08
Просмотров 7 тыс.