Basic Rules for RCC Column Construction | Column Casting Mistake Solution
Join this Training and get started:- civilguruji.page.link/fzFXZ5Z...
For More Details Call Now : 9111001234
About This Video -------------------------------------------------------------------------------
In this video Er. Akash Bohare, Corporate Trainer of Civil Guruji explaining about Basic Rules for RCC Column Construction | Column Casting Mistake Solution
Columns carry the load of structure and hence they are critical. It is important to align them for verticality so that load is transmitted properly. The column shuttering should be strong enough to take the pressure of fresh concrete and remain in position during concreting. Basic Rules for RCC Column Construction | Column Casting Mistake Solution
To hold the concrete shuttering firmly in place and for proper alignment a concrete pad called starter is cast before fixing the shuttering. The thickness is about 45 mm to 60 mm and dimensions are precisely the same as the dimensions of proposed column. The starter should be cured for a day or 2 so that it is hard enough to fix the shuttering around it.
Column box or shuttering for columns is made of plywood sheets or steel sheets fabricated with adequate stiffeners. Basic Rules for RCC Column Construction | Column Casting Mistake Solution
A thin films of oil or grease should be applied to inner surface of the shuttering to enable easy removal of the column after the concrete hardens. Shuttering should be properly aligned to its verticality and diagonals to be checked to ensure accuracy in dimensions.
Formwork has to be thoroughly supported with props size before pouring the concrete so that it does not moves horizontally or vertically during concreting. The gaps near the shuttered joints should be sealed with plaster or a piece of wood to prevent any leakage of slurry. Basic Rules for RCC Column Construction | Column Casting Mistake Solution
Appropriate space is to be provided in the inner face of the shutter and reinforcement by fixing cover blocks of about 40mm. It is preferable to remove shutters after 24 hrs. of casting and if they need to be removed earlier, it should not be removed within sixteen hours. The removal of shutters has to be done gently without jerks so that edges of columns are not damaged. Care should be taken regarding fixing and supports of column shuttering to prevent it from movement during concreting.
Diagonals of the shuttering to be checked to ensure dimensional accuracy.
Basic Rules for RCC Column Construction | Column Casting Mistake Solution
Follow our Official Social Media pages-
You Can Also Download Our Mobile Application :-
play.google.com/store/apps/de...
Join Our Telegram Group
t.me/JoinCivilGuruji
Like Our Facebook Page :-
/ 411013642352412
Follow us on Instagram
civil_gurujii?i...
And, Grow your Practical & Software skills.
rcc column,column casting mistake solution,common mistakes in column construction,basic rules for lapping length in column,column construction mistake,big mistake in rcc column in construction site,column mistakes,column design,8 common mistakes of rcc column at construction site,basic rules for lapping length in rcc columns in telugu,civil engineering basic,house construction basic,column starter,building construction,column concrete ratio,column
Basic Rules for RCC Column Construction | Column Casting Mistake Solution
#RCC #Construction #Column #Casting #Mistake #Solution
22 янв 2022