Can We Actually Repair This Foundation? (DIY concrete on a budget) 

Ambition Strikes
Подписаться 599 тыс.
Просмотров 249 тыс.
50% 1

We attempt to save thousands by repairing the old foundation // AD: Use code AMBITION50 to get 50% OFF your first Factor box plus 20% off your next month at bit.ly/3XmaZGH
We're a husband and wife team who bought 20 acres of bare off-grid land in North Idaho. Follow along as we learn how to build a home, run heavy equipment and turn this place into our dream property!
► SUBSCRIBE for videos every Sunday: bit.ly/2VUaUOJ
► SHOP Our Merchandise: ambitionstrike...
► JOIN our mailing list: mailchi.mp/amb...
Support Our Channel & Get Exclusive Content: / ambitionstrikes
Instagram: / ambitionstrikes
Facebook: / ambitionstrikes

Опубликовано:

 

17 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 517   
@AmbitionStrikes
@AmbitionStrikes 7 дней назад
Use code AMBITION50 to get 50% OFF your first Factor box plus 20% off your next month at bit.ly/3XmaZGH
@fyithisisnotrocketscience5150
@fyithisisnotrocketscience5150 3 дня назад
Being a general contractor for close to 40 years, a little bit of advice on digging and pouring footers, you never add dirt to a dugout footer and compacted. Your footer, always needs to be on virgin ground and not on compacted soil. You might want to check with your local building officials to confirm what I’m saying.
@Synaptic_gap
@Synaptic_gap 3 дня назад
I'm guessing there is no inspection schedule.
@fyithisisnotrocketscience5150
@fyithisisnotrocketscience5150 3 дня назад
@@Synaptic_gap with or without an inspection, you should never backfill a footer compacted and then pour the footer on top of it
@wyattwiehr9447
@wyattwiehr9447 3 дня назад
What about being below the frost line? I’m sure in Idaho it’s well below 2 feet in Wisconsin it’s 4ft.
@beesbo1856
@beesbo1856 3 дня назад
Good advice. I also noticed that they drove (pounded in with hammer) the rebar into the soil. This isn't good practice since the rebar will rust, water will wick up the rebar, and rust jacking would cause cracks in the concrete, letting in more water. Should have tied all the vertical rebar with a horizontal run and block it off of the ground. Rebar should never be put into the dirt.
@mgdubya27
@mgdubya27 3 дня назад
I noticed that too.
@doughale1555
@doughale1555 3 дня назад
Where did you find Andy? Everyone needs an Andy!
@janpcs
@janpcs 3 дня назад
Mr & Mrs Adventure have their own Andy.
@franksmith3602
@franksmith3602 3 дня назад
Just a tip.. when setting J bolts.. don't pound on the threads. Screw two nuts on each end. Leave one nut up above the threads a little. Then pound on the nuts . Then your not smashing the top starter threads.
@AmbitionStrikes
@AmbitionStrikes 3 дня назад
Oh man, I wish we had thought to do that! I think we’re going to pay the price this week for that. 😬
@random-person1
@random-person1 3 дня назад
@@AmbitionStrikes you can always cut the worst of the threads off and it will be much less of a problem
@Sembazuru
@Sembazuru 3 дня назад
​@@AmbitionStrikes Another remediation you might want to consider just in case is get a thread chasing die. Similar to a thread cutting die, but designed to re-shape existing damaged threads.
@franksmith3602
@franksmith3602 3 дня назад
@@random-person1 hahaha, if putting two nuts on a J bolts...you have bigger problems. I love watching those with zero history in the trades. Teach how to do things wrong...funny stuff.. and, the walls will break away from the slab, and sink when you put a house in top of it. A smart person would have a engineering firm do a soil study. Check how thick the slab is. And why so much of the SOILD basement walls failed and cracked away.. but hey I'm old school...but I used to build 15 house a month down south for Jim Walter homes. Have designed and built 28 million dollar estates in LA. And even built a cliff side house estate hanging over a ocean front cliff. 200 feet above the beach. That when we were done. Bank appraiser gave it a 35 million dollar price. ( Step one, soil study. Step two find how deep the footers are. Step three do the math of the tons your going to add and see if the cheap ass slab concrete PSI can withstanding the tons.. old school.)... Math never lies, like the three little pigs... Build crap, the big bad wolf blows it down... In this cast...it sinks. Good luck. Money waisted is...little Casper's college funds...Oliver....needs a nest egg also.. Best luck..
@johnlockington9872
@johnlockington9872 2 дня назад
Run an angle grinder on a 45⁰ around the end of bolts​@@AmbitionStrikes
@kiwirabbit1
@kiwirabbit1 3 дня назад
So you owe Andy and his wife a huge thank you for the help and labor they provided. They got you to where you are today.
@leifhietala8074
@leifhietala8074 День назад
CAN WE JUST TAKE A MOMENT TO APPRECIATE THE UNSUNG GENIUS OF AN ON-SITE FRIDGE. I have never ever done that and I am never going to forget it.
@user-fu1bh3dt2c
@user-fu1bh3dt2c 3 дня назад
Andy is a treasure. Keep him happy and keep him around!
@colleenbow777
@colleenbow777 3 дня назад
Great pump guy Alex and his son Roman. Also our friends and neighbors!
@fyithisisnotrocketscience5150
@fyithisisnotrocketscience5150 3 дня назад
A little word of advice from personal experience when you backfill after floor framing make sure that you don’t get your dirt any higher than 8 inches from the sill plate and then slope all your ground away from your house
@franksmith3602
@franksmith3602 3 дня назад
A quick. Slab test... Now that you added tons to yours... Blow off the slab.... Buy a big glass marble. Drop the marble, in different spots and see what way it rolls if any. If it rolls use a red lumber crayon make a arrow the way it rolled. In two weeks. Do it again. If the slab is sinking or sisting, the marble will roll differently. Oh, I'm old school. Used to run cast iron , waist lines poured hot lead. We used water hose levels. And you always had a marble with you.. great for bath tubs. Instantly know if the water drains to the plug....good luck..
@billvandorn5332
@billvandorn5332 День назад
Using hot light and jute for cast iron pipes... I had the blessing to be taught by Master when I was a young teenager. I found it so rewarding, a little boring but very rewarding!
@mikef3550
@mikef3550 3 дня назад
Always nice when my week long wait for a new episode comes to an end, love yalls videos.
@dscottpeterson6653
@dscottpeterson6653 4 дня назад
I was worried about that block wall until you filled it with concrete. Perfect.
@jimthode
@jimthode 3 дня назад
Where is the vertical rebar in the wall and the horizonal bond beam with rebar on top of the wall? Rebar is need in a concrete block wall!
@cyclemoto8744
@cyclemoto8744 2 дня назад
what about the rest of the problems?
@JML542
@JML542 День назад
@@jimthode I believe they placed vertical rebar in the holes of the blocks, but I don't know about horizontal.
@melparker7711
@melparker7711 3 дня назад
Don't back fill until you get the floor system in it helps support the wall.
@Sailor376also
@Sailor376also 3 дня назад
No. No. right at 1:20 You NEVER shovel dirt back into a hole you have excavated. MONSTER Nono. Undisturbed soils under your footing only. IF you must back fill you only do that with non compacting graded material,, Pea stone, sewer stone, both are considered 95% plus compaction when they hit the ground. If you are using sand,, you need lots of water and a compaction machine and only in less than 6 inch lifts, and even then,, It will settle. Just what you don't want,, settling dirt under your spread footing foundation.
@billvandorn5332
@billvandorn5332 День назад
I also hear it's important to have washed stone without any dust to help for compacting
@georgej7077
@georgej7077 3 дня назад
It's code in my neck of the woods to have a separate non perforated pipe to manage the roof drain water. The theory is that you won't clog the French drain with debris from the roof. Hopefully you won't have an issue. 🤞 Great video!!
@ronblack7870
@ronblack7870 3 дня назад
that's what they did
@spenceralridge4958
@spenceralridge4958 3 дня назад
@@ronblack7870 They almost kept them separate, but they tied the two together at the rear corner of the house. In theory, any blockage at or downstream of that point will cause both the french drain and the gutter drain to back up.
@georgej7077
@georgej7077 3 дня назад
@@spenceralridge4958 that should work 👍
@cornbreadreturns296
@cornbreadreturns296 2 дня назад
@@spenceralridge4958 Yup. You'll want a cleanout for sure after the roof downspout to catch any roof debris before entering your whole system.
@franksmith3602
@franksmith3602 3 дня назад
When the pump guy said to much sand in the mix. Note that's how concrete company's save money. A yard of sand is 25 bucks. You paided $250 a yard. If the slump is not right. All the love u give it. A Sandy mix will not carry a load.
@beesbo1856
@beesbo1856 3 дня назад
I have a concrete pump. Mine will only pump 1/2 inch minus gravel. Not sure what theirs claims to do.
@PaddockRadio
@PaddockRadio 2 дня назад
Loving Andy getting involved in shooting bits, it's awesome to see him step further out of the guest spot and really becoming part of the channel :D Hi Andy! Spot on, mate
@paulwackerla6330
@paulwackerla6330 3 дня назад
I wasn't sure the concrete walls were worth saving, but you guys did it and it saved you a lot of money. Great job!!
@musictolive4
@musictolive4 3 дня назад
Yes, they saved the walls. But that doesn't mean that the walls are good. The side walls were cracked. They "repared" them, but the walls are still cracked. And cracks in a concrete wall is and always will be point of weakness and chance for leakage.
@grantnyenes3742
@grantnyenes3742 3 дня назад
That’s really starting to come together nicely now!
@Paullebbon
@Paullebbon 3 дня назад
Just 3 weeks is incredible. Great work guys! I have been watching your videos for a few months and each video just gets more and more interesting. Keep up the great work.
@amundson1942
@amundson1942 3 дня назад
A suggestion...Don't use Galvanize pipe in from your transition through the foundation. Use copper or what ever type of PEX in use today. The iron pipe won't last long. From a former plumber. I've been out of the business over 30 years so I don't know what they call the PEX pipe today.
@billvandorn5332
@billvandorn5332 День назад
Had a boss who used a special listening device for drips from pipes in concrete. The galvanized was more prone than the copper, but some of the copper was not as good as what was American made. Either way was a major inconvenience for the homeowners ripping up carpets and slabs. The slabs that were tension poured we wouldn't touch
@govertical72
@govertical72 День назад
Municipalities are paying millions across the country to replace galvanized pipe, PLEASE DONT BURY THAT IRON PIPE! Replace it with CTS poly, please!
@JML542
@JML542 День назад
It's so great to see that you guys bit the bullet and took the time to demo everything that was not reusable. Starting off with a clean slate it so important!
@edwardhughes3240
@edwardhughes3240 3 дня назад
Riley, Reuse the measuring tape that you broke! Solidly mount it somewhere in your shop for measuring steel wood, whatever. Maybe glue it to the floor. Eddie
@Nostradougus
@Nostradougus День назад
I only wish I had more Andys in my life. Count yourself lucky beyond words.
@shaniaa9287
@shaniaa9287 2 дня назад
You are too amazing for words Riley ❤. Can you believe how far you've come so far with Courtney and boom boom? Who would have thought 10 years ago, you'd be here at this point in your life today. Thanks you so.much for all your videos , teaching us the correct way to do things for tomorrow 👍. I appreciate you and the entertaining way you're teaching me....❤❤❤
@CptnSavage
@CptnSavage 4 дня назад
You might have considered saving the run off from the roof for emergency water storage. I have a 500 gallon emergency water tank so my wife and I have about 200 days of emergency water. It's cheap to do and costs very little.
@AmbitionStrikes
@AmbitionStrikes 4 дня назад
That's a great idea!!
@CptnSavage
@CptnSavage 4 дня назад
@@AmbitionStrikes Yeah, if you so some web searching, you can find large rectangular water storage containers, filters and pumps to move the water from one container to the next and put a string of them alongside the building under the eaves out of the weather and protected. Put them on the side of the building where there are no windows and simply stack them in a line. The water runs off the roof, down the gutters through debris screens so that mostly only water goes into the catch barrel which is then filtered into the storage tanks. There are detailed plans on the web for how to do it. Figure 1.5 gallons per person per day for drinking, bathing, dishes, cooking, etc. Then plan your storage tanks accordingly. FREE WATER, why not.
@spenceralridge4958
@spenceralridge4958 3 дня назад
I understand why Riley and Courtney would consider that at their own place (because they have a shallow well) but why would you need 200 days worth of emergency water? Just curious.
@raycheshire5581
@raycheshire5581 3 дня назад
@@spenceralridge4958 gardening or in case of fire perhaps….just some guesses
@vanman3752
@vanman3752 3 дня назад
Many States prohibit rain water catchment because the State considers rain water Imminent domaine. Just like a well, the water in the well belongs to the State.
@68lehman
@68lehman 4 дня назад
Nice Work Guys!
@GirdHerd
@GirdHerd 3 дня назад
Riley, Never backfill under a footing or foundation. If you over dig, you must fill it with concrete. You can never compact soil to 100% with a compactor. The best you can hope for is 90% which leaves room for settling. Good luck.
@SkypowerwithKarl
@SkypowerwithKarl 3 дня назад
You beat me to it. I see cracks and settling in the future 😢
@brianrydzeski6108
@brianrydzeski6108 3 дня назад
Agreed.
@keithfrazier2558
@keithfrazier2558 3 дня назад
Most people use sand bags for void areas so it doesn't cost so much where it doesn't need to be that thick like the floor, but not footers. Like patios and steps, the center they use sand bags, then the footers edges they just fill with concrete.
@k1sfd1974
@k1sfd1974 3 дня назад
Or a thousand gallons or so of water for hydrocompaction (at low psi). Depending on soil composition anyway. Although with the way it looked from just the rain. I’d give it a few days to dry out. Especially since water cannot compact, so it can make the footer settling later even worse.
@chuckdavis7681
@chuckdavis7681 3 дня назад
I used to be a project manager for an electric utility. We often compacted fill well over the 100% of the virgin earth. I remember getting 140% compaction on one project. But to know this, you have to take soil density test before and during the compaction process. You also limit fill to nine inch lifts prior to compaction. Moisture content is key to good compaction and our soil had a high clay content. So I disagree with it's not possible to get 100% compaction, but I don't doubt you're correct with the way it was done here. I've also seen virgin soil settle over time.
@dalebailey1844
@dalebailey1844 3 дня назад
do not forget to put on a screen on the outlet to your drain clean out to keep the critters out. HAVE A GREAT DAY!
@2hlix
@2hlix 3 дня назад
What I've seen foundation teams do for permanent inner forms to be left in place for the sand form you did was 2" rigid foam board. Bonus you get some insulation but it's non rotting forms too
@ronblack7870
@ronblack7870 3 дня назад
called insulated concrete forms. the foam is on both sides of the concrete walls and stays there permanently. the foam is the form.
@franksmith3602
@franksmith3602 3 дня назад
When ever trying to see how thick a slab or footers are. Do this drill holes 1/2" down thru the slab. Get a metal rod. Like a welding rod. Bend a small angle on one end. Shove it thru the hole. And get to one side of the hole and pull up till it stops.. mark the rod. Turn it , pull it up and measure how thick the concrete is.
@JohnStevenson-bm2no
@JohnStevenson-bm2no 3 дня назад
Good work people, all of you
@cedricbroussard8738
@cedricbroussard8738 3 дня назад
It's coming together beautifully! Keep up the hard work 💪🏻
@thethreeamigos6764
@thethreeamigos6764 3 дня назад
Well done guys, you and Andy have done marvellous ❤❤
@itzjoeylo4501
@itzjoeylo4501 3 дня назад
I would suggest a varment / animal barrier at the end of your French drain
@AmbitionStrikes
@AmbitionStrikes 3 дня назад
That is a really good idea. 😬
@itzjoeylo4501
@itzjoeylo4501 3 дня назад
@@AmbitionStrikes I’m honored and glad to help…
@nenoxxd6353
@nenoxxd6353 3 дня назад
I love Andy. Do they have their own channel?
@uoobwatcher
@uoobwatcher 3 дня назад
That’s what I’m wondering too.
@travman2863
@travman2863 3 дня назад
🤔At 27:06 be sure to add a screen at the end of your drainage pipe to prevent Critters clogging it.👍👍👍👍🌎✌
@lgrantnelson2863
@lgrantnelson2863 3 дня назад
Great looking job. It's great being able to get all the trucks in without a problem. Looking forward to next week.
@carolewarner101
@carolewarner101 2 дня назад
Everything rests on the foundation. Not the sexiest part of the build, but arguably the most critical for the success of the whole project. A TON of hard work, but it will pay off major. Congrats on having this part in the rear view mirror!
@stephenbergman6226
@stephenbergman6226 3 дня назад
Add a screen cap over the drain pipe,it will keep out critters
@jessieg371
@jessieg371 3 дня назад
Thought the same thing!
@BarrettGreg
@BarrettGreg 3 дня назад
lol i posted that as well before reading this comment.
@robgardner2288
@robgardner2288 3 дня назад
Be sure to not fully backfill the three walls until you get your first floor system constructed. There are substantial lateral earth pressures at work and the tops of the walls are unrestrained with no ability to resist those pressures.
@leolarocque-v5v
@leolarocque-v5v 2 дня назад
Thanks for the video on the fondation and more .
@kellygb9278
@kellygb9278 2 дня назад
For the small knee walls, you needed to drill & add rebar to the floor and the foundation wall. This would tie the knee wall into the floor and will tie it into the foundation walls Great Job! look forward to more content
@busarob1969
@busarob1969 2 дня назад
Got to say guys and girls, Ambition Strikes has to be my favourite, “ this is how they do it”. You tube Channel. Thanks guys
@olgringo-421
@olgringo-421 3 дня назад
To each is own, but I would highly recommend NOT driving the re-bar directly into the soil. This is an open invitation for corrosion that eventually will creep upwards into the actual concrete structure. As we all know, as re-bar starts to corrode, it expands - possibly causing your foundations to crack in the distant future.
@ronblack7870
@ronblack7870 3 дня назад
if they still own the house in 20years
@olgringo-421
@olgringo-421 3 дня назад
@@ronblack7870 --- Doesn't matter who owns the house whenever - still possibly gonna corrode/swell and crack the foundation someday. IMHO, it's just a poor construction practice.
@philrodger6445
@philrodger6445 3 дня назад
The movement of the wall at 27:33 is exactly why you don't backfill before building the floor system on top of the wall at the very least.
@lorenmeyer5290
@lorenmeyer5290 3 дня назад
You are doing an AWESOME JOB guy's! Love watching your building projects!
@ralphswartz7961
@ralphswartz7961 2 дня назад
When bending rebar use a short length of 3/45 inch pipe and place it close to what is holding the rebab and you will get much tighter bends. Also never drive rebar inti the ground because it is a path for rust to get to the rest of the rebar.
@patthornton1212
@patthornton1212 3 дня назад
As always informative and up beat Thanks.
@1944chevytruck
@1944chevytruck 2 дня назад
LOOKING GOOD!
@naffsharpe
@naffsharpe 3 дня назад
As a Brit from NE England originally I'm trying to place Andy's accent (because I'm a nosy git! ) my guess is East Yorks/Lincolnshire. Not hard enough for N Yorks or further N. Please enlighten , he is a damn good grafter!!
@alysiachristensen5475
@alysiachristensen5475 2 дня назад
You guys are awesome!!! I love to watch you work together!!!
@BWIL2515
@BWIL2515 2 дня назад
Just watched both of y'all's videos on this build series and I'm officially KNACKERED 😊 thanks for sharing
@EvilGenius.
@EvilGenius. 3 дня назад
Super Pro on the water drain guys! That is better than most professionals do!
@RoscoeColtrane
@RoscoeColtrane День назад
This comment is scary on so many levels.
@MikeC19100
@MikeC19100 2 дня назад
You discovered by accident how much nicer the finished cement looks when it's a little wetter during the pour. While that doesn't always work great on large slabs, it seems to have been just what you needed for that footer and foundation project. DITTO on the earlier comments about pounding the J-Bolt threads and not pouring a footer on virgin soil. I was a little worried when it rained and what it looked like after you removed the support boards. At least you're ready for the next steps to get some structures built so you can start seeing the actual home walls, which is always a cool part of the project because the progress seems to go much faster than it does working on the foundation and block walls.
@phuongvo3051
@phuongvo3051 3 дня назад
It is so nice when you have the frid right on the side work 😂❤. I’m so exiting and can’t wait to see you frame the walls , great work .
@vanman3752
@vanman3752 3 дня назад
Isn't it common practice to have the floor system in place before backfilling? I guess it helps keep the foundation walls from moving especially if heavy machinery is used to compact the soil.
@ronblack7870
@ronblack7870 3 дня назад
yes they don't know what they are doing
@byrdman1807
@byrdman1807 22 часа назад
Andy the practical joker! Love it!
@Truthvector
@Truthvector 2 дня назад
Who needs building codes when you've got Ambition's Army. Got the new truck t-shirt and it feels great.
@grahamheath3799
@grahamheath3799 3 дня назад
from the UK I have got to love the approach to building planning no just make it a bit bigger, inspections no just dig pour and hope.
@Bbhhhhj
@Bbhhhhj 3 дня назад
It looks like they are using galvanized pipe into the house. I hope they reconsider and replace with a more suitable alternative before it becomes inaccessible.
@rudyfisher7660
@rudyfisher7660 3 дня назад
If it was me, I'd put a box where you made that connection so you wouldn't have to dig it up again, put the box coming up out of the ground, then your connections right there. You could also put a shutoff Alvin, instead of connecting your pipe straight to it. That way, you could always shut it off and fix anything. But make sure it's one of them that you can put one of those long t handles with a turning now
@MarkFlucke
@MarkFlucke День назад
Grouting the wall-perfect!!!!
@bmart73
@bmart73 2 дня назад
Your the money man, you do what you want on the job
@janamcq.3713
@janamcq.3713 3 дня назад
🔥I cannot believe how quickly your channel has EXPLODED!! 🎆 Wasn't it like a year ago that you celebrated 100K Subs?
@MarkSnop
@MarkSnop 2 дня назад
You guys always fun to watch your videos! Thanks for another great one looking forward to the next one as always
@ElijahPerrin80
@ElijahPerrin80 3 дня назад
Thank you so much Andy, I've got to admit it's getting better, A little better all the time.
@user-cg1ki9gt4p
@user-cg1ki9gt4p 2 дня назад
thank you for the bring along. i can't wait until some ask you to build them a road. all the toys at work.
@MxODraconis
@MxODraconis 2 дня назад
I love that put in sub-titles for Andy, like he's not speaking English.
@robertforslund5025
@robertforslund5025 2 дня назад
Remember to widen the diameter of the pipe before going under the driveway. If You need a 110mm round the foundation drain and the same for gutters - all that can't be led out in a less than 160mm at the junction. A heavy rain will otherwise go back in / under the foundation, we (Sweden) use 30 sq-meter roof / 80mm downpipe and max 2 110-pipes to a 160mm.
@jamesbeckett4390
@jamesbeckett4390 3 дня назад
This is quickly becoming one of my favourite RU-vid channels. Keep up the good work guys! Nice to see how you do it over there compared to here in the UK.
@naturenut7695
@naturenut7695 3 дня назад
The only complaint I have about this video is that it's too short. 😂 Looking great!
@Qwiv
@Qwiv День назад
Little tip, always ask for a mix design and send it to the pumper and the finishers. They typically can read them and know which makes their life hard. Adding water is less than ideal obviously.
@Km.SiuLane007
@Km.SiuLane007 3 дня назад
Hi guys you should collect the water for watering crops or plants
@ronallen6578
@ronallen6578 3 дня назад
Riley, NEVER backfill up against a foundation until you have the cap on top of it. You run the risk of cracking it and that is a big problem. I'm sure you'll do it anyhow, regardless of having had a suggestion not to.
@cornbreadreturns296
@cornbreadreturns296 2 дня назад
One note - you should check out French Drain Man's products - before you run those gutters into your system, you'll probably want to get one of his gutter adapters. It has a some awesome filtering to catch stuff from your roof before it goes in. Also consider a catch basin just in case you have any roof gravel depending on your type of roof. If you don't have a catch basin, that roof gravel will ultimately end up clogging your PVC run under your driveway, etc. Nice work!
@junkyardsearcher6407
@junkyardsearcher6407 3 дня назад
I’d put a grate on the drain output to keep critters out
@mikecapps1603
@mikecapps1603 3 дня назад
Simply put.....you guys ROCK!
@johnwilson8922
@johnwilson8922 2 дня назад
Nice work yall!
@GirdHerd
@GirdHerd 3 дня назад
I'm glad to see you separated the gutter drain from the french drain around the footing. Why would you want to intentionally put rain water at the footing every time it rains?
@Larry-g9k
@Larry-g9k 3 дня назад
Looks fantastic it’s a lot of help having Andy. 💯
@Jbzy3000
@Jbzy3000 3 дня назад
Every step you make on your property gets me more excited
@francisbarbeau1862
@francisbarbeau1862 3 дня назад
Great effort everyone! Can't wait until the next video!
@johnshaw4140
@johnshaw4140 3 дня назад
Good job folks
@beckycrump8831
@beckycrump8831 3 дня назад
Add a removable screen to the pipe where it daylights to keep critters out. Hard lesson to learn.
@highrx
@highrx 3 дня назад
Hey, when installing i joints, x block in between them to reduce bounce in the finished subfloor. Scab in plywood plates on the end of the i joints for the deck rim joist brackets to go into. Don’t skimp on the glue.
@fyithisisnotrocketscience5150
@fyithisisnotrocketscience5150 3 дня назад
You need to wait to backfill your walls until after you have your floor framed up and that front wall put in
@BarrettGreg
@BarrettGreg 3 дня назад
just a heads up that drain needs a screen over it or you will get rats and even snakes crawling up in it. Some simple hardware cloth would work. Great video as always. Cant wait to see the rest of the build.
@bradcouch6898
@bradcouch6898 3 дня назад
Great Job Riley and Andy.
@RC-fu6hg
@RC-fu6hg 3 дня назад
Amazing work everyone! Loved it 👍
@doggonedk
@doggonedk 3 дня назад
It was nice that you got some really great help out there. Hate to be in armchair quarterback but I'm afraid tying your roof water into your footer water may overwhelm that pipe. Might want to ask around could be perfectly okay in your area. But great job filling those walls with concrete!
@dlbracer56
@dlbracer56 2 дня назад
Looks AWESOME
@devarskinnee8760
@devarskinnee8760 2 дня назад
Maby a clean out in that drain? future plug up .just sayin.concrete work primo! Andrew is a d-8 ,a true Saxon of a son!! mighty Man,is our man Andrew!!! God bless you all.
@dans737
@dans737 2 дня назад
@10:53 "and the truck didn't get stuck" THAT'S RIGHT!! plus remarkably few pulleys were used this time - movin on up!
@billlandon2160
@billlandon2160 3 дня назад
Best “fixit” and “do it” channel on the entire cyberspace
@Xplorer60
@Xplorer60 2 дня назад
Good job Andy with that water bottle trick...lol
@cjg8822
@cjg8822 3 дня назад
Excited for building phase next!!!
@carefreeclubhouse1714
@carefreeclubhouse1714 3 дня назад
Looking good, keep on going. This has been a fun series.
@LilYeshua
@LilYeshua 3 дня назад
It was a fairly good pour with the exception that the pump had old setup concrete on the grate and most likely it had buildup plus they didn't have a wall hose U pipe piece. You could've gotten up with the concrete company to see if they'd make a custom mix for you unless they didn't weigh the batch materials right at the plant and the mixer driver didn't do a good enough job of eyeballing the load before leaving the plant.
@VanisleNSX
@VanisleNSX 2 дня назад
I like the microwave in the frunk! Worked like a charm.
Далее
The most INSANE foundation // Shop Build 2
16:29
Просмотров 126 тыс.
Transforming My $1 House (Week 6)
13:17
Просмотров 92 тыс.
ДОМИК ДЛЯ БЕРЕМЕННОЙ БЕЛКИ #cat
00:38
БЕЛКА РОЖАЕТ? #cat
00:26
Просмотров 510 тыс.
What Happened To Our New Catamaran?
31:54
Просмотров 380 тыс.
This is Why No One Wanted The House
31:54
Просмотров 234 тыс.
Can You Forge Magnesium?
16:41
Просмотров 685 тыс.
Bad Investment With Client Slabs
29:06
Просмотров 935 тыс.
Installing our floating deck!
19:28
Просмотров 88 тыс.
The Real Reason The Boeing Starliner Failed
28:31
Просмотров 959 тыс.
ДОМИК ДЛЯ БЕРЕМЕННОЙ БЕЛКИ #cat
00:38