Most probably,CAT would have engineered that machine,to do exactly that sort of work,knowing it would suit those contractors.Any CAT machine can easily,cope with the 'stress'.In the old days it was called 'over engineering'.Bearing in mind,machines 'wrestle' concrete,on a daily basis.Some easily replaced parts,probably do get stressed.