China is making railwayline from Afghanistan to Iran and then from iran directly to China which will connect China on one side with middle east and on the other hand with central asia. China no longer needs ML1 in Pakistan. It was so delayed because Pakistan didn't know it while China knew about this plan already.
Not china need this .this is entire paks railway need .you don,t mess this with china .china do what its need either afghan or Iran pak has no problem with them.
Project be completed by China after great Imran khan become Pm Pm Imran khan go to.bejing meet China president XI & get this project ML1 And also bullet train projects To have network of bullet trains Rich Pakistan be part of new world alliance China Russia Pakistan Turkey Afghanistan Saudi Arabia Uae Oic country First they free Palestine & this strong alliance Boycott Israel &India
9 years is way way lot time, Karachi to Lahore all area is straight, no mountains , double track already exists. They only have to replace it, Kharian to Peshawar areas are mountainous only. Should finish it in 4-5 years.
Sirf track nhi bichana hota pehle track ka liye zameen bhi sahi karni hoti ha phr loop tracks bhi banany hotay han signal system bhi new lagay ga station upgrade hon gy to itna time lagay ga
Sir china 🇨🇳 has suffered huge losses Trillions of Dollars in own construction sector n in Malaysia millions of appt empty n half built people cant afford to buy china not willing to lend more money same Arabs are not rich as they were because USA is pummping huge Quantity oil selling to Europe before oil get wothless in 20-30 years so they have not many who buy their oil pakistani miltary and politicians yes dont understand it so pakistan need to do self we can learn from Ethopia how they raised money for huge Dam from own resourses 5 billion USD
یار کوئ اور contact نہیں ہے اپ کے پاس ،ایک دن کہتے ہو ml1 شروع دوسرے دن کہتے ہو ختم ،ایک دن کہتے ہو۔ ایران سے گیس ائے گی ،دوسرے دن کہتے ہو نہیں ائے گی ،۔ کچھ رحم کریں ہم پر ،اور اپ کا چینل ہم اتنے شوق سے دیکھتے ہیں ،لیکن اب content نہیں ارہا اچھا😢😢
After Imran be Pm After election China start many projects ML 1 & more new projects Bullet train New railway network N ew tracks New trains Etc Rich Pakistan gets developed
جب شروع ہوگا تب پروگرام پیش کریں ، دس سال ہوگئے ، اور شروع ہونے کے بعد دس سال لگیں گے اور پروجیکٹ کو ایک عام سا پروجیکٹ بنا دیا ، جو آج سے 60 سال پہلے دنیا میں تھا ،2035 تک مکمل ہونے کا وقت ہے اگر شروع ہوگیا تو ،اور تاخیر تو لازمی ہوتی ہے ،2040 تک مکمل ہوگا ، اس وقت تک نیپال کے پہاڑوں میں بلٹ ٹرین چل رہی ہوگی ، بھائی معاف کردے ایک عام سے پروجیکٹ کے لئے ہمارے کان کھاتا رہتا ہے تیری مہربانی ،
140 ki speed compete nhi kry gi motorway ko bus or train lhr to krachi same time me. Phonchy gy phir kia faida arbon dollar lagany ka 160 ki speed thk rhy gi
China na koi refuse nhi kia tha us ilzam ko china na kaha tha hamari taraf sa koi corruption nhi hue jo corruption hue ha woh pakistan ki taraf sa hue ha jo ka project hand over honay ka bad hue ha
China after election When Imran khan be pm Invest in better project Pm Imran will make bullet train network in Pakistan Rich Pakistan needs standard trains Pm Imran make total network bullet train Rich Pakistan railway n better then all neighbors Nepal & India poor people with 3rd class trains Rich Pakistan bullet trains High standard
China will slowly back off from pakistan,, they to have realised our worth. Watch slowly cpec dying,, Chinese investments rolling back. Goodluck gwadar you have been abandoned
Ya asal ma CPEC ka project tha hi nhi ya Asian. Development bank ka sath project banaya tha sheikh rasheed na jisay nawaz shareef na china ka hawalay krdia jiski wajah sa ya aj tak nhi ban saka
The flip side of the postponement is good for the country, why? Because it is a trimmed version of the original ML1 project, and with two major flaws in it that will haunt the nation in decades to come. The first flaw is the reduced speed of trains from 180KM/hour to 120KM/hour; the rest of the world introducing 1000KM/hour like in Canada or hyperloop projects. Contrary to this, we introduce a 120KM/hour speed train system which is very slow for businesses in modern times. The second and the most dangerous flaw in that was the removal of barriers in the rail-road way --- This reduces the cost but simultaneously will increase the cost in three areas (I) Frequent Accidents and Repair Costs (II) Insecure Travelling (Business community will not prefer it). (III) The accidents will cause delays and goods/services will not accomplished at the desired time. All in all, this ML1 project with two major flaws will be counterproductive and a waste of huge investment and money. Now we have time to rethink and make this ML1 project more speedy 200+km/hr and with reliable security barriers in the pathway of rail-road.
Ksi kutttiii amaaa k bachy imrandooo yahodi ki satttt cpec ko delay tre bappp imrandooo bondyyy ne kia tha sowarrr k bachy pdm ne tu dobara isko revive kia haraaami youthiye 3 saalo me cpec ka beragark kia imrandooo sowarrr ne
China is baray ma bata chuka ha pti ki government na CPEC Pa kabhi kam band nhi kia aur unho na kaha ky sb sa zyda kam bhi pti government ma hua CPEC pa han china na sirf 1 chezz pa aiteraz kia tha ka regulate na kren is project ko