Don't like the way the front steadies scrubbed on the ground. Don't expect those feet to last long! I would have thought a 3 hydraulic jack system (2 on the axel and 1 on the A-Frame) would have been better for load distribution on the chassis (when we are always been told not to jack the van using steadies!!), with just the steadies lowered when the caravan was finally levelled!