Тёмный

Conrail Track Work, Wyandotte, MI 9/19/08 (Part 1) 

Подписаться
Просмотров 11 тыс.
% 34

(Part 1 of 3) Conrail was doing some track work, replacing the grade at the Goddard Rd. crossing in Wyandotte, MI. I was at the St. Johns St. crossing recording the signals activating and de-activating as the MOW kept going back and fourth. I also got a GT train coming through as well.

Кино

Опубликовано:

 

20 сен 2008

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 13   
@owensri2
@owensri2 16 лет назад
Thanks :) I just thought I'd get something special instead of just plain ole trains going through the crossing. They were there again working today, but this time, on the opposite track...and the gates were doing the same thing.
@owensri2
@owensri2 16 лет назад
They were divided up between Norfolk Southern and CSX...only leaving a small percentage in the Detroit area and in New Jersey. Through here, Conrail operates as a terminal railroad for local customers.
@owensri2
@owensri2 16 лет назад
They were stirring up the rocks and re-settling them, and that is the dust you see blowing.
@owensri2
@owensri2 16 лет назад
Not this stretch of tracks that runs from Ecorse, MI to Trenton, MI. It's still Conrail here...due to the shared assets operations agreement. :)
@DownriverRailProductions
@DownriverRailProductions 7 лет назад
Why are you breaking the crossing signals Rich? Lol :)
@parkertilson3547
@parkertilson3547 12 лет назад
1:31 why is the gate here down and the one at the other side up?
@videolover2014
@videolover2014 6 лет назад
It's the way it does that at Railroad Crossing reactivate while the Gates are in the middle of going up, as how it was programmed for all Railroad Crossings in Trenton, Wyandotte, & Ecorse with the 2 Gated Signals & the 6 Mast Signals, the Gate on the East Side goes back down right away while the West Side waits a few seconds before the Gate goes back down, even if it's in the middle of raising the Gate. There's a Difference to it, as I know about this problem to what you're talking about.
@csxmansam
@csxmansam 16 лет назад
i thought csx and ns took over conrail
@Pasco-Spokane-Railfan-2024
@Pasco-Spokane-Railfan-2024 Год назад
It's still conrail through there because of the shared assets agreement
@claire1667
@claire1667 15 лет назад
why are some of the gateless signals not working?
@videolover2014
@videolover2014 6 лет назад
It's the way it was programmed. The Mast Signals on the Inner Tracks will only work if there's a Train or a Malfunction on any of the Inner Tracks while on the Outer Tracks, the Back Lights will work for the same on if there's a Train or a Malfunction on any of the Outer Tracks while the Front Lights & the Gate Lights will always flash with the Bells ringing & the Gates lowering, no matter which Track the Train is on or no matter which Track is malfunctioning at the time.
Далее
РЫБКА С ПИВОМ
00:39
Просмотров 1,1 млн
ТИПИЧНОЕ ПОВЕДЕНИЕ МАМЫ
0:21
Просмотров 1,6 млн
#nature #animals #documentary #savan
0:45
Просмотров 7 млн