Unloading them is a pain in th but 😂 All the containers coming from China are full loaded of pipes The space between pipes and the roof is very small. The hardest part is when they are tied in twelve The only choice is the way u r doing it in the video But u still need that space😢 I do it for 13 years with a Linde h160 Be safe i have only one helper u had 6 😀
@@Bkonstas1 it is an economical and professional job, meaning less cost with safety and the machine used is kalmar 36 tons capacity meaning 1-Driver vision is almost zero meaning less safety, 2- high cost. Same job could be done by done faster, cheaper and more safe by using 2 forklifts 7 tons each.