Crystal Palace Dinosaur Swing Bridge
Client: Friends of Crystal Palace Dinosaurs
Architect: Tonkin Liu
Structural Engineer: Arup
Detailed Structural Engineer (substructure): Cake Engineering
Fabrication & Main Contractor: Cake Industries
Cutting: M-Tec Ltd
Galvanising: Joseph Ash, Chesterfield
Piling and foundations: Capital Piling
Lifting: City Lifting
Fabrication team: Oliver Cheyne, Carwyn Evans, Ed Jacobs, Marnie Robinson, Quinn Thompson
Installation team: Alastair Tweedie, Oliver Cheyne, Andy Creed, Keefer Erickson, David Knight
Footage prepared by: Cake Industries with assistance from Timelapse Scotland (Stuart Younger)
www.cakeindustries.co.uk
© Cake Industries 2020-21
6 окт 2024