Hello Friends, In this video lecture today I will show you some useful information for column footing and its foundation reinforcement details. for more details visit to : civilstudents.com/
How would you do the pad foundations for a 28m x 10m building that is on a slope? The difference in ground conditions is 1.5m from the start of the building to the end. Do we have longer pieces of steel at one end? How do we get all the pads level correct for the steel
@Civil Engineers | Sir please confirm if we have steel bars available inside the plinth beam so if we raise an additional pillar over plinth beam after tying the steel bars of column with steel bars of plinth beam so is this arrangement is correct or incorrect? and how it will impact on the overall structure strength.
You gave us details of dimensions of footing but you didn't tell us it is the footing of what kind of building. Is it for residential building or? If it is residential, for how many storey ?
in this building how many floors? if we got to do ground+two upper floor building (total height from ground to roof is 32 feet) what should be the base ? is it should be same or less?
Dear This foundation for how many stories ? I am planning to built ground plus 2 floors . please suggest depth of footing and steel to use hiw many mm roda 16 mm and 12 mm ?
We just need to calculate the no. Of bags of cement required and after that the volume of sand and aggregate will get easily with respect to the cement
3 monjila ghor banane ke liya coloumn mai kitni mm ki steel (rod) hona ..ground flow or 1st flow slab hoga or 2nd flow steel sheet ki hogi... 12 mm 4 pics or 8 mm 2 pics dene se kaisa rahega
Ise Bolte h kisi Ko kya pata chalna hai, paise Bach rhe hai And this types of mistakes collapse the building Shame on this type of engineers and foreman