Тёмный

Design Capacity and Effective Capacity - Calculating Capacity Utilization and Efficiency Rate 

Dr. Haywood
Подписаться 9 тыс.
Просмотров 17 тыс.
50% 1

#designcapacity #effectivecapacity #capacityutilization #efficiency #capacityplanning
In operations management, design capacity refers to the maximum amount of output that a system, process, or resource can produce within a given period of time, while maintaining the desired level of quality. It is the amount of work that a system or process can handle without exceeding its capacity constraints.
Effective capacity management requires a company to constantly monitor and evaluate its production systems and processes, making adjustments as necessary to ensure that they are operating at maximum capacity and minimizing bottlenecks and other constraints.
Capacity utilization is a measure of the degree to which a system, process, or resource is being used to its full capacity. It is expressed as a percentage of the actual output produced relative to the maximum output that could be produced if the system, process, or resource were operating at full capacity.
Efficiency rate is a key metric in operations management, as it provides insight into the productivity and performance of a company's production systems and processes. A high efficiency rate indicates that a company is using its resources effectively and efficiently, while a low rate may indicate that there are inefficiencies or waste in the production process.
00:00 Intro
00:29 - Agenda
00:48 - What is Design Capacity?
01:03 - Capacity Example
03:39 - How to calculate the design capacity
05:47 - What is Effective Capacity?
06:00 - How to Calculate the effective capacity
10:00 - How to calculate the capacity utilization
12:00 - How to calculate the efficiency rate
13:09 - Keys to remember the formulas
14:44 - Key Takeaways
Connect with me on Social Media!
/ derrickhaywood
/ drdhaywood
/ drdhaywood

Опубликовано:

 

30 июл 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 18   
@GorgeousFlakes
@GorgeousFlakes 2 месяца назад
This playlist along with study guides helped me pass this class! Thank you!!!
@drdhaywood
@drdhaywood Месяц назад
Glad to help.
@nesternunez8430
@nesternunez8430 7 месяцев назад
This whole playlist is exceptional..!!
@drdhaywood
@drdhaywood 7 месяцев назад
Thanks a ton.
@MamaOwlbear
@MamaOwlbear 5 месяцев назад
You are such a good teacher!
@drdhaywood
@drdhaywood 5 месяцев назад
That's very kind of you. Thank you! 😃
@tinnagrace8008
@tinnagrace8008 3 месяца назад
im happy i found this playlist before my exam in 2weeks im hoping for a pass
@drdhaywood
@drdhaywood Месяц назад
Hope the exam went well...
@mihaelaivanova5799
@mihaelaivanova5799 6 месяцев назад
wgu student! I hope i pass.. thanks for this ! much help
@drdhaywood
@drdhaywood 5 месяцев назад
You're welcome!
@user-ut4gq8rh6n
@user-ut4gq8rh6n 6 месяцев назад
Thanks for explanation
@drdhaywood
@drdhaywood 5 месяцев назад
You're welcome.
@ahmedahmed-yc5bi
@ahmedahmed-yc5bi Месяц назад
i know its a year ago but thank you
@drdhaywood
@drdhaywood 15 дней назад
You’re welcome
@beccao5477
@beccao5477 Год назад
Thanks for the explanation. I now have a fair idea of capacity utilization. Can this be applied to a service product? if yes how?
@drdhaywood
@drdhaywood Год назад
You're very welcome...And Yes! For example, a restaurant has a specific level of capacity for the number of people they can serve. Both capacity utilization and efficiency rate can be calculated based on the number of people they serve relative to the design capacity and effective capacity. I hope this helps.
@Simplified_Business_Systems
@Simplified_Business_Systems 6 месяцев назад
I was under the impression that we should calculate design based on 24 hours even if the facility is only open for 8. Is this correct?
@drdhaywood
@drdhaywood 5 месяцев назад
Hey - good question. It depends- You can calculate design capacity based on 24 hours but usually it is based on the production time. That can be a standard 8 hr work day, 12 hr work day, or a 24 hr work day for production companies that produce 24 hrs a day. It ultimately depends on how the organization chooses to do the calculation relative to their production schedule. Hope this helps.
Далее
#kikakim
00:31
Просмотров 11 млн
Good deed #standoff #meme
00:15
Просмотров 336 тыс.
Resource Capacity Planning with an example
39:28
Просмотров 27 тыс.
What is the Theory of Constraints?
14:55
Просмотров 20 тыс.
QDC1 Chapter 5 - Strategic Capacity Planning
27:28
Просмотров 79 тыс.
Capacity, Bottleneck, and Resource Utilization Analysis
18:27
Back-Of-The-Envelope Estimation / Capacity Planning
8:32
Bottelneck Analysis in Capacity Management
13:32
Просмотров 14 тыс.
What is Capacity Planning in Operations Management
5:57
#kikakim
00:31
Просмотров 11 млн