In this video you will understand about the various Types of doubts asked by engineers on comments and here is the video explaining about all the doubts.
Here the doubts questions:
1) Doubt on Chair in different building component
2) Positioning of Distribution bar in slab.
3) What is crank distance ?
4) What is point contraflexure & how to find it out ?
5) Why dont we provide continuous crank bar ?
6) Spacing of stirrup in Beam & no of stirrups
and many more questions
How to find out Two way Slab ? and various more details about TWO WAY SLAB BAR BENDING SCHEDULE.
Slab Bar Bending Schedule (BBS) consist of Main Bar.
Slab Bar Bending Schedule (BBS) consist of Distribution Bar at bottom which act as main bar in two way slab because of its load distribution direction.
Slab Bar Bending Schedule (BBS) consist of Top Distribution Bar.
Slab Bar Bending Schedule (BBS) consist of Top extra bar Bar.
FRESHER CIVIL ENGINEER must understand the importance of site visit in their Training Duration.
Site visit plays a very crucial role like :
Basic knowledge about building material in site visit
Basic knowledge about handling labour in site visit.
Basic knowledge about machinery in site visit.
Basic Knowledge about BAR BENDING SCHEDULE in site visit.
About BAR BENDING SCHEDULE:
1) BAR BENDING SCHEDULE gives the detailed information about type of bar, size of bar, cutting length of bar, quantity of bar etc.
2) BAR BENDING SCHEDULE saves the wastage of steel and saves the project cost.
3) BAR BENDING SCHEDULE helps in making detailed Estimation.
In this video you will understand about the various Types of doubts asked by engineers on comments and here is the video explaining about all the doubts.
Here the doubts questions:
1) Doubt on Chair in different building component
2) Positioning of Distribution bar in slab.
3) What is crank distance ?
4) What is point contraflexure & how to find it out ?
5) Why dont we provide continuous crank bar ?
6) Spacing of stirrup in Beam & no of stirrups
and many more questions
How to find out Two way Slab ? and various more details about TWO WAY SLAB BAR BENDING SCHEDULE.
Slab Bar Bending Schedule (BBS) consist of Main Bar.
Slab Bar Bending Schedule (BBS) consist of Distribution Bar at bottom which act as main bar in two way slab because of its load distribution direction.
Slab Bar Bending Schedule (BBS) consist of Top Distribution Bar.
Slab Bar Bending Schedule (BBS) consist of Top extra bar Bar.
FRESHER CIVIL ENGINEER must understand the importance of site visit in their Training Duration.
Site visit plays a very crucial role like :
Basic knowledge about building material in site visit
Basic knowledge about handling labour in site visit.
Basic knowledge about machinery in site visit.
Basic Knowledge about BAR BENDING SCHEDULE in site visit.
About BAR BENDING SCHEDULE:
1) BAR BENDING SCHEDULE gives the detailed information about type of bar, size of bar, cutting length of bar, quantity of bar etc.
2) BAR BENDING SCHEDULE saves the wastage of steel and saves the project cost.
3) BAR BENDING SCHEDULE helps in making detailed Estimation.
In this video you will understand about the various Types of doubts asked by engineers on comments and here is the video explaining about all the doubts.
Here the doubts questions:
1) Doubt on Chair in different building component
2) Positioning of Distribution bar in slab.
3) What is crank distance ?
4) What is point contraflexure & how to find it out ?
5) Why dont we provide continuous crank bar ?
6) Spacing of stirrup in Beam & no of stirrups
and many more questions
How to find out Two way Slab ? and various more details about TWO WAY SLAB BAR BENDING SCHEDULE.
Slab Bar Bending Schedule (BBS) consist of Main Bar.
Slab Bar Bending Schedule (BBS) consist of Distribution Bar at bottom which act as main bar in two way slab because of its load distribution direction.
Slab Bar Bending Schedule (BBS) consist of Top Distribution Bar.
Slab Bar Bending Schedule (BBS) consist of Top extra bar Bar.
FRESHER CIVIL ENGINEER must understand the importance of site visit in their Training Duration.
Site visit plays a very crucial role like :
Basic knowledge about building material in site visit
Basic knowledge about handling labour in site visit.
Basic knowledge about machinery in site visit.
Basic Knowledge about BAR BENDING SCHEDULE in site visit.
About BAR BENDING SCHEDULE:
1) BAR BENDING SCHEDULE gives the detailed information about type of bar, size of bar, cutting length of bar, quantity of bar etc.
2) BAR BENDING SCHEDULE saves the wastage of steel and saves the project cost.
3) BAR BENDING SCHEDULE helps in making detailed Estimation.

Опубликовано:

 

6 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 146   
@mitalpatel164
@mitalpatel164 4 года назад
sir two way slab ka bbs batavo
@satyashrayeesahoo7178
@satyashrayeesahoo7178 4 года назад
Excellent teaching sir👍, yes sir aap thik hi bola mene jesa socha tha ki ulternate crank bar hi provide karna chahiye,, but mene bahut sari vdo se dekha ki dono side crank then ek straight bar provide kiya hai, but aaj doubt clear hogaya🙏🙏
@deepakbohra171
@deepakbohra171 4 года назад
Sir financial problems hai plz ap RU-vid par he maximum videos upload kare
@noumaniqbal1981
@noumaniqbal1981 2 года назад
Sir Assalam o alikum. Sir aap ka samjanay ka tarika bohat zabardast hai Mash Allah aur Sir aap ki videos say main ne bohat Kuch seekha hai.
@shariqgour4479
@shariqgour4479 4 года назад
Sir slab ka level kese krte h uspe bhi bnado ek video
@MDMAKhanVlogs
@MDMAKhanVlogs 4 года назад
Sir, Your teaching style is very very good way for success
@surajrathod7409
@surajrathod7409 4 года назад
Thanks a lot sir your vedios are so helpful for me ,I'm in final year (civil engineering) by watching your vedios I correlate them with my ongoing syllabus and its getting too easy for me to understand the actual concept behind the theory specially of these two subjects i.e ADVANCE CONCRETE STRUCTURE & ESTIMATING AND COSTING. Sir you are doing great . please post more vedios like this Thank you with anticipation sir.
@comedytarka9587
@comedytarka9587 3 года назад
Sir foundation layout ke upar video banao on site.
@sudhindrahr5204
@sudhindrahr5204 4 года назад
When the slab bars are cranked alternatively, then at the supports, the spacing between cranked bars would be double the spacing of main reinforcement. In this case, additional top bars are provided to maintain the spacing as shown in the video. In case of continous slabs, why are the top extra bars required when the crank bars of adjacent slabs fit in the slot to make up for the required spacing?
@vadiveluthiyagarajan8060
@vadiveluthiyagarajan8060 3 года назад
Excellent Explanation ji We need more videos for designing section to know the load calculation of beams and slabs.
@pritamdas5658
@pritamdas5658 4 года назад
Sir first of all ty so much for picking my question. Sir in your two way slab video you explained about both side crank bar . But unable to understand how above one crank bar we will go for another side crank bar . specially at the support. Please explain sir ..
@vivekraj8093
@vivekraj8093 4 года назад
Sir, pls make a video on bbs of staircase
@er.deepaktewatiya808
@er.deepaktewatiya808 4 года назад
Sir please make a video on continuous beam bbs, dia of mai bar changing column to column.
@surajrathod7409
@surajrathod7409 4 года назад
Sir kindly make vedio on how crank bar and distribution steel placed or bend at end or at the junction of beam column
@sanguine6071
@sanguine6071 4 года назад
1. Sir as per IS CODE : 456:2000,Cl.26.5.1.3,Pg-47...We have to provide SIDE FACE BAR if the depth of footing or beam increased by 750mm...So my doubt is...What's the purpose of providing it and how many no. of bars as per depth we can find it out.... 2. Sir if we are placing reinforcement bar upto 40m length(raft foundation) with laps...So my question is....Will it be suitable for a column to be placed above those lapping if it's coming....Or what will be the alternative for this or at what distance we will cut the steel so that it will not come in between the column....
@HOUSEDESIGNBYENGG
@HOUSEDESIGNBYENGG 4 года назад
Bbs of beam with drawing in excel full detail please or simpl way me
@ashutoshkote4687
@ashutoshkote4687 2 года назад
Sir plz upload Video for calculating bar bending schedule for 1 slab span having beams 4
@majharulhaque2601
@majharulhaque2601 3 года назад
Thank you sir for given better knowledge
@chandru101
@chandru101 4 года назад
Thank you so much SIR. Plz tell detail reinforcement in chejja and staircase Sir.. Plz..
@SagarKumar-vp6zu
@SagarKumar-vp6zu 4 года назад
Sir please make a video on cutting length for rcc members I am so confused . What is cutting length????
@subodhjoshi1211
@subodhjoshi1211 4 года назад
nice explanation
@sourajgupta5222
@sourajgupta5222 4 года назад
Sir it is very informative but please tell something in detail about vertical spacing and no of bars we should suggest as per dia.
@sagarmgaikwad467
@sagarmgaikwad467 4 года назад
Bahut badiya knowledge sir
@noumaniqbal1981
@noumaniqbal1981 2 года назад
Sir Assalam o alikum. Sir aap ne number of stirrups main corner pe +1 Kiya hai dono side pe laken jab center pe number of stirrups nekal lay gay Tu Total Span/ C/C distance -1 karna hota hai
@sanjaybasumatary5859
@sanjaybasumatary5859 3 года назад
sir, you are doing good explanation 👏 again please make a video of Box culvert 2 cell 3×3
@Imrankhan-eg3yz
@Imrankhan-eg3yz 3 года назад
Thank you Sir you are great teacher I am very impressed
@KaranSingh-ul8sh
@KaranSingh-ul8sh 3 года назад
Superb sir explanation I have the question about how to give cutting length practically in field with minimum wastage in column beam and slab please help
@navedkureshi4026
@navedkureshi4026 4 года назад
Sir BBS in advance Excel sheet please.,
@civilsitevisitsk5121
@civilsitevisitsk5121 4 года назад
Superb explanation Sir
@susmitachatterjee4197
@susmitachatterjee4197 4 года назад
How to design collumn beam .what will be design of collumn and beam according to span in simply supported continous beam.
@rupeshmeansenrique
@rupeshmeansenrique 4 года назад
Good going sir Really appreciable I wanted to know, how to decide LD at site for different different situations
@savitapal9099
@savitapal9099 4 года назад
superb vedio
@satyashrayeesahoo7178
@satyashrayeesahoo7178 4 года назад
Sir rate analysis in excel sheet ke upar jyada vdo upload kijiye, excel ka link description mai dijiye, (earthwork, pcc, Rcc, plaster etc....) us din jese site cleaning ke upar rate analysis & BOQ ke upar vdo tha,, wese hi ek ek din ek vdo upload kijiye excel mai.
@AHoney-xl9ux
@AHoney-xl9ux 4 года назад
Nice explanation but please guide that 0.15 L ( Disconnected portion) this is for slab or beam. If it is for beam, can we take 0.15 L for slab at Disconnected end?
@sangramkumardutta3401
@sangramkumardutta3401 4 года назад
In Central part stirrups no will be( {3850 - (2×1265)}÷(150 )) - 1 .Mind it it's very much important
@parthasarathidas7420
@parthasarathidas7420 3 года назад
sir ek rqst hai ki fresher's ke liye koi bhi constraction company mai interview ke liye jo importent quiestion hota hai uska ek series banaw ....jahape jo besic quiestion hota hai koi bhi interview ke liye woha ek cinfidence mile .....plz sir bohot hi help ho jata .....
@peshkarverma5711
@peshkarverma5711 4 года назад
Sir your vedio is very good sir I want please teach bbs in excell sheet with example.
@CkChetal
@CkChetal 4 года назад
sir in striups , hum distance center to center le ya phir inner to inner le ya outer to outer toh 3 methods se cutting length mein different different aati hain....kya value ko change kare ki length same aaye?? aur site pe koun se method se ring execute kiye jate hain...
@rojaypal3601
@rojaypal3601 4 года назад
Sir can you provide the proper details of end connection of beam and column and intermediate beam column connection? Lapping zone for continuous beam
@saurabhsrivastav2610
@saurabhsrivastav2610 3 года назад
सर staircase ke steel Ka cutting length निकालना detail me बताइए सर
@PANKAJKUMAR-ln4kw
@PANKAJKUMAR-ln4kw 4 года назад
Sir ,How much does the length increase when we bend the bar?
@shubhamkushwah3875
@shubhamkushwah3875 3 года назад
Its 2d or 3d depend on degree of bend
@sanjibsharma6677
@sanjibsharma6677 3 года назад
Sir, How many pieces of top distribution bar are actually needed for 14*13 feet room?
@shahjiconsultancy2023
@shahjiconsultancy2023 4 года назад
how to deside footing size , coloum size , beam size in any structure plssss provide one video
@chandrashekharwaghalikar9314
@chandrashekharwaghalikar9314 4 года назад
How to calculate the length of crank portion? In 3+2bar placement at what spacing tie bar shall be placed?
@pritishmukhopadhyya6826
@pritishmukhopadhyya6826 4 года назад
SIR PLEASE MAKE A VIDIO ON BBS IN ALL members like column,slab,lintel,pile,pile cape,footing as per IS SPECIFICATIONS
@sanketpatel189
@sanketpatel189 3 года назад
Diaphragm wall construction detail pe video bnao na
@dark__love7390
@dark__love7390 3 года назад
Slab reinforcement.... Beam reinforcement k sath kaise join krte hai
@nobel12321
@nobel12321 4 года назад
Sir corporate training course kitne month ka h
@soumajitdey4041
@soumajitdey4041 4 года назад
Sir, Great video, but I am request to you please make a video Raft footing details, read drawing & bbs
@ashutoshkote4687
@ashutoshkote4687 2 года назад
Also how much spans to be considered while calculating main top bar bottom bar s etc
@savitapal9099
@savitapal9099 4 года назад
Akash ji i want to know about retaining wall bars which are bend in slab by L/4 in slab. so ho can we know that this l/4 from clear span or including beam support .so plz describe this l/4 condition junction from retaining wall to slab
@abdulwajidansari3305
@abdulwajidansari3305 4 года назад
Thanks sir... Sir alternative bar ke niche bottom bar dena chahiye yha nhi
@mohammadserajalam569
@mohammadserajalam569 3 года назад
Thank u sir mujhe bahut aacha lagta aap class aap ka bahut bahut shukriya. Sir Is code kya hota or us ka pura details bataye please Thank u sir
@Civil_Guruji
@Civil_Guruji 3 года назад
Ok Seraj... We will try..
@Standwiththehindus
@Standwiththehindus 4 года назад
How do we understand the extension is from the crancked bar and not a straight rod fixed in the top reinforcement from the drawing
@Civil_Guruji
@Civil_Guruji 4 года назад
Hello Engineers, ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-JF9PFNqfA74.html This is the MUST WATCH video for Details about TWO WAY SLAB. Keep Supporting Us SHARE as much as you can 👍🏻
@chandpasha657
@chandpasha657 4 года назад
Sir BBS calculation for colum and cutting of colum
@harshgandhi7235
@harshgandhi7235 4 года назад
Excellent video...
@rahul69295
@rahul69295 3 года назад
Sir development length 5od ko beam me keise or kaha tak provide kare....?
@moharsinghchaudhary4650
@moharsinghchaudhary4650 3 года назад
sir excel par bar binding schedule ki video pl.
@mathstube1802
@mathstube1802 4 года назад
sir can you share as per IS code point of view the top extra bar is considered L/4 but in you BBS beam video i saw its not coming L/4??
@AbhishekSingh-cj6lx
@AbhishekSingh-cj6lx 4 года назад
Sir how we add lapping portion of beam column and slab in bbs full sheet explain plzz
@jitendrapawar224
@jitendrapawar224 4 года назад
Thank you Sir Very helpful video
@pritamdas5658
@pritamdas5658 4 года назад
Sir you are saying about topic. Sir if someone tell me you are an engineer so please estimate for my building but i'll be unable to do whole building . Specially don't know about it . Like in our college we are taught center line calculation which is not enough so sir please teach that topic ..
@Civil_Guruji
@Civil_Guruji 4 года назад
In the Corporate Training Course, we have taught Detail Estimation ... Download the Civil Guruji app
@pritamdas5658
@pritamdas5658 4 года назад
@@Civil_Guruji sir i have downloaded the app.In your course you are teaching so many subject so price is high but unable to pay that amount at a same time at current situation 😢
@kunalkapdi6439
@kunalkapdi6439 4 года назад
Make a video on rate analysis
@jk_prajapati
@jk_prajapati 4 года назад
Sir tension zone mai tie beam alternative ho sakta hai.. without Crank and trapezoidal ..
@MohdSaif-oq3ow
@MohdSaif-oq3ow 3 года назад
Sir beam me crank bar lag ta kya , hiden beam pr ek video
@sohanjatav404
@sohanjatav404 3 года назад
Sir IS code pr video banayiye
@vikashmishra7440
@vikashmishra7440 4 года назад
Sir , how we make bill of quantity by csr rate
@vikassingh-dk8li
@vikassingh-dk8li Год назад
Sir Crank bar beam me upar wala saria ke upar me rhega ya under me
@nikhiltudu8362
@nikhiltudu8362 4 года назад
Full estimate exel sheet Mai kaise kare ekk video banaiye sir plzzzzzzz🙏🙏🙏🙏🙏
@swapnilgaikwad7703
@swapnilgaikwad7703 3 года назад
Sir thank you video ke liye
@mohdmohiuddin7666
@mohdmohiuddin7666 4 года назад
How to read lift core. Please tell me details of lift
@rajkumarprajapat1777
@rajkumarprajapat1777 4 года назад
Stirrups ki cutting lenght centre to center hi measure krte h Kya?
@sadikali1986
@sadikali1986 3 года назад
Sir aapne to bataya thaa ki top L/4 ka distance effective span lete hai aapne to clean span liya hai sir
@jangbazmotivation
@jangbazmotivation Год назад
footing ka layout kaise kare sir
@akashkamble3291
@akashkamble3291 4 года назад
Sir sab type ke stirups pe video banao BBS ke
@anandtatwaday5704
@anandtatwaday5704 4 года назад
Hello sir my name is Devendra Kumar Sir slab me top distribution bar , cranck bar, bend bar top extra bar kyaa hoth he or drawing me kese Read kre
@Mr.Civil_engineer_babu
@Mr.Civil_engineer_babu 4 года назад
Sir ji continuous slab ka ek video ho Jai..
@darshanmankoti7625
@darshanmankoti7625 Год назад
I like ur all videos
@abhisekmedya4502
@abhisekmedya4502 4 года назад
What is tie bar in beam???
@official_vickygaming
@official_vickygaming 3 года назад
All BBS drawing reading with calculation
@noranglalsaini5726
@noranglalsaini5726 2 месяца назад
Sir beam ke center me to ring spacing jyada hota hai
@abhijeettiwari9200
@abhijeettiwari9200 3 года назад
Thankyou so Much sir
@ashutoshkote4687
@ashutoshkote4687 2 года назад
I mean for all four beams
@pathaninayatulla3410
@pathaninayatulla3410 4 года назад
hi civil guruji sir total bbs detalis handling site labour site visit sir
@hamidulislamsarkar
@hamidulislamsarkar 4 года назад
Sir beam pe top extra bar hai ,but crank bar keu Nahi hai ? Can we use crank bar any type of beam?
@varadarajks2069
@varadarajks2069 3 года назад
Here also made mistakes in calculating number of styrrups at centre.. It should be -1 instead of +1
@firdausahmad2861
@firdausahmad2861 4 года назад
Very helpful session to everyone, only question, can we provide Crank in single continuous bar at mid beam.
@somanathsundara5890
@somanathsundara5890 3 года назад
How to understand drawing for fresher
@CourseforcivilEngineering
@CourseforcivilEngineering 4 года назад
Nice sit plz continue
@Samantray-r5x
@Samantray-r5x Год назад
Sidul samajhne ka asantarika
@sakshiconstruction
@sakshiconstruction Год назад
Bhut acha sir ji
@Civil_Guruji
@Civil_Guruji Год назад
Thank you Sakshi construction Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe. KEEP LEARING, KEEP SHARING.
@skriyaj5397
@skriyaj5397 4 года назад
That 25mm dia tie bar is also known as spacer bar.
@christanopradeep2767
@christanopradeep2767 2 года назад
you are awesome brother
@vivekshukla7912
@vivekshukla7912 3 года назад
Please give detail steel of box culvert
@Civil_Guruji
@Civil_Guruji 3 года назад
Vivek ji Civil guruji will provide you the video soon in this topic. Keep learning and keep supporting us
@ABDULRAHIM-em6df
@ABDULRAHIM-em6df 4 года назад
Sir circle beem ka extra bar kaise nikalenge
@aamirsohail3863
@aamirsohail3863 4 года назад
Sir what if we have very long beam.. Then how can we do this in excel..
@bitupansonowal6520
@bitupansonowal6520 4 года назад
What is the purpose of dividing the two way slabs into edge strips and middle strips as per IS 456:2000 ?
@zachariahemanuel4017
@zachariahemanuel4017 3 года назад
I guess im asking the wrong place but does someone know a trick to log back into an Instagram account?? I somehow lost the password. I love any assistance you can give me
@theokieran5353
@theokieran5353 3 года назад
@Zachariah Emanuel instablaster :)
@zachariahemanuel4017
@zachariahemanuel4017 3 года назад
@Theo Kieran thanks so much for your reply. I got to the site through google and I'm trying it out now. Takes quite some time so I will reply here later with my results.
@zachariahemanuel4017
@zachariahemanuel4017 3 года назад
@Theo Kieran It did the trick and I finally got access to my account again. I'm so happy! Thanks so much you really help me out :D
@theokieran5353
@theokieran5353 3 года назад
@Zachariah Emanuel You are welcome :D
@yogkshemchauhan
@yogkshemchauhan 4 года назад
Sir ye kese pta chlega ki bar 10mm ya 8mm ki lgegi mtlb ki bar itne mm ki ho ye kese jane
@er.deepaktewatiya808
@er.deepaktewatiya808 4 года назад
Sir continuous beam bbs mai main bar ka dia change ho rha to kyse krte hai, Ld le ke yeah, L use karke pl. Sir clear kar do bhot bda confusion hai Thanks sir.
@chetanpathak4932
@chetanpathak4932 4 года назад
Inclined m bbs kase kare ring bracket