Тёмный
No video :(

Drillmec Mobile Rig MR5000 Carrier (2016) 

Drillmec
Подписаться 2,8 тыс.
Просмотров 62 тыс.
50% 1

Drillmec MR Series mobile trailer and self-propelled rigs are used for conventional drilling, workover and well service applications. Drillmec covers this variety of applications by manufacturing a full range of rigs capacities from 60 up to 250 metric ton. The drawworks, carrier and mast capacities are combined to provide the best performances. The MR Series fully mechanically driven rigs are designed

Опубликовано:

 

6 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 20   
@RitzeliezelGaborne
@RitzeliezelGaborne 2 месяца назад
3:11 powerful rig good job drillmec
@myphoneconnected177
@myphoneconnected177 Год назад
Drillmec! That's such an intelligent and hard-working team, best of luck 🎱 guys
@ivithos2128
@ivithos2128 Год назад
This is a beautiful example of engineering. Workover (mobile) rigs typically have a crew of 4 men. They never have access to cranes. While nice this is impractical. A Typical workover rig can be rigged down and on the road in 1 hour or less. It can pull on location be spotted and rigged up in the same amount of time. The role these rigs serve in the states require flexibility combined with durability and resilience that dictate a simple solution. What I see, when I look at this, is all the points of failure that can occur during time critical activities while the rig is 2 hours or more away from any source of parts of expertise.
@RitzeliezelGaborne
@RitzeliezelGaborne 2 месяца назад
Powerful rig nice ang good jod drillmec
@YunchuanZHAO
@YunchuanZHAO 4 года назад
How long did it take to mobilize the rig and rig up on location?
@mohamedatef2384
@mohamedatef2384 4 года назад
This is very nice Rig thanks mobile
@khalidalhadidi6402
@khalidalhadidi6402 6 лет назад
This rig for petroleum development Oman
@zadguzel4854
@zadguzel4854 5 лет назад
For PDO
@reapouch7187
@reapouch7187 6 лет назад
💎💎💎💎💎💎💎💎💎💎💎💎
@coltondry7814
@coltondry7814 6 лет назад
just no need for all of this... don't see rigs like these being popular in texas for another 10 years...
@drillmecspa
@drillmecspa 6 лет назад
If you prefer work with old rigs and old technology is your problem ... don't understand your post
@brianseich
@brianseich 6 лет назад
I think what he is saying is its way too much bs .... Most work over rigs would be in set up and job completed by the time this thing got rigged up....
@epistte
@epistte 5 лет назад
@@brianseich I don't see anything on this rig that would take longer than the usual workover rig to set up or break down. You can't compare the drilling function to the workover function. With the exception of the enclosed cab for the operator, it looks pretty standard to me.
@brianseich
@brianseich 5 лет назад
Any real service rig should be ready to trip in the hole within two hours of arrival........ this thing is a fucking joke
@brianseich
@brianseich 5 лет назад
Dude it's clear you dont know shit about workover rigs ...... you should never need a crane to assist in rig up operations.... the extra hydraulics are gonna be an issue ..... plus the 8 line block would be dog shit slow ..... it's just an over engineered piece of shit
Далее
Drillmec Land Rig DM 1000 (2016)
8:07
Просмотров 38 тыс.
IT'S MY LIFE + WATER  #drumcover
00:14
Просмотров 9 млн
DRILLMEC HYDRAULIC RIGS HH Series (Complete 2016)
6:40
Drillmec Corporate Profile 2016
8:52
Просмотров 4,4 тыс.
Patriot Energy Rig Site Drilling Process
7:15
Просмотров 1,1 млн
RDS Pipe Handler
3:05
Просмотров 32 тыс.
Volant CRTi on automated drilling rig - Long
10:20
Просмотров 137 тыс.
ME 3,000 Land Drilling Rig
3:08
Просмотров 41 тыс.
Offshore Rig Operations
7:18
Просмотров 64 тыс.
Well Control
12:41
Просмотров 498 тыс.
Honghua America New Rig
6:55
Просмотров 18 тыс.