This feature of the Progress 2.0 allows the operator to know in advance the performance of the crane before opening it and before lifting.
In fact, on the remote control display it is possible to read the actual horizontal load chart of the crane, automatically calculated by Progress 2.0 in accordance to the stability conditions of the vehicle and the direction in which the crane is facing.
In addition, the system is able to show the lifting performance of the crane even in a predictive way, that is in all the other positions of the crane column rotation, different from the booms current one, allowing you to better plan your work (advantage: “Time to money”).
This function even shows the load diagram also with the crane and the stabilizers completely closed, thus making a real-time simulation of the opening of the stabilizers and the crane, facilitating and reducing the placing of the vehicle.
16 окт 2024