A technical overview of the installation process for the complete Enphase Energy System, including IQ8 Microinverters, IQ System Controller 3 INT, and the IQ Battery 5P.
How do they protect from backfeed when the mains go down, the blokes working on the outside line so they don’t get a shock from somebody up flow using solar, there cannot be an automatic shut off as the solar tricks it to think there is 230 volts from somewhere and staying open.?????? It confuses me how they arrange it.
Dear, I live in the Philippines. I intend to install a 3,2 kW PV installation. But here they have a 2 * 130 V grid, no zero lead. How do I have to connect the micro inverters?