Тёмный

Ep 05 - Solar Project BESS (Limpopo) 

Solar Hub SA - BESS
Подписаться 10 тыс.
Просмотров 2,4 тыс.
50% 1

Episode 5 of the Limpopo BESS Project Series is LIVE!
In this episode, we reach a major milestone at our solar power project near the Botswana border in Limpopo. After 6 weeks of anticipation, the container housing our critical components has finally arrived on site!
What's in Episode 5:
Cable Work Completion: We've finished all the AC and DC cabling, meticulously ensuring every connection is perfect for optimal performance.
Container Arrival: The much-awaited 12-meter container is now on-site. This container includes:
The MegaRevo Mega 250 inverter
Three IES 172kW high-voltage storage banks, providing a total of 516kW of energy storage
Integrated with FirePro fire suppression and dual air conditioning units on a smart controller
Monitoring via the Sevula monitoring system
Cable Terminations & Commissioning Prep: Our team is diligently completing all cable terminations, getting everything ready for the commissioning phase.
Equipment Highlights:
JA Solar 565W panels mounted on KD Design aluminum ground mount structures
Four Huawei Grid Tie inverters and PV combiners forming the grid-tie section
AC isolation distribution board for safety and efficient energy distribution
We're incredibly excited to be approaching the commissioning stage of this 417kW grid-tied PV plant, bringing us one step closer to delivering sustainable energy solutions in Limpopo.
🎥 Watch Episode 5 here: [Watch Now](Your RU-vid Link)
We're also thrilled to announce that we're close to 10,000 subscribers on our RU-vid channel! 🙏 Thank you to everyone who's been part of this journey.
Please like the video, leave a comment, and subscribe to our channel if you haven't already. Your support is invaluable and helps us continue to share and promote renewable energy innovations.
👀 Stay tuned for Episode 6, where we'll dive into the commissioning process and see the system come to life!
#RenewableEnergy #SolarPower #SustainableFuture #EngineeringExcellence #SolarHubSA #LimpopoBESS #Episode5 #MegaRevo #IES #Huawei #JASolar #10KSubscribers

Опубликовано:

 

1 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 6   
@hugohattingh8911
@hugohattingh8911 16 дней назад
Well done team! I have followed this project from day one@ amazing wow wow!@!!!!!!!!!!
@SolarHubSA
@SolarHubSA 10 дней назад
Thanks Hugo, please join us for the open day on the 4th of October.
@SchylahJoubert
@SchylahJoubert 16 дней назад
Well done , julle is ysters. My God bless you 🎉🎉🎉
@SolarHubSA
@SolarHubSA 16 дней назад
Dankie! We are going from strength to strength!
@ClemCardoso
@ClemCardoso 16 дней назад
Great work gents. 💥
@SolarHubSA
@SolarHubSA 10 дней назад
Much appreciated, hope to see you on site!
Далее
Saudi Arabia Built a $16BN Clock Tower
25:21
Просмотров 1,5 млн
Ep 06 - Solar Project BESS (Limpopo)
10:22
Просмотров 382
Understanding Porsche's New Six Stroke Engine Patent
21:57
20 Most Incredible Abandoned Cars That Actually Exist
26:12
The Problem with Wind Energy
16:47
Просмотров 2,6 млн
The Problem with Solar Energy in Africa
18:20
Просмотров 7 млн