Тёмный

(EWL disruption day 6; another train race) SMRT - KSF C151B (689/690) (Jurong East » Boon Lay) 

Подписаться
Просмотров 237
% 2

Date & Time: 30 September 2024, 10:25pm
Train model: Kawasaki Heavy Industries & CRRC Qingdao SiFang C151B
Train set: 689/690
Train run: 501 (Jurong East/Boon Lay shuttle service, eastbound track)
Carriage filmed: 2690 A4/B4
Mild vibration + slightly strong motor at 2690 A4/B4
CONTEXT: On 25 September 2024, a KHI C151 train (Set 065/066, unknown train run number) developed a fault during the AM peak hours (approx. 9am) while heading westbound and was detrained at Clementi. While heading back to Ulu Pandan Depot (UPD), a defective train axle box located at car 2065 A1/B1 dropped, causing the wheels to drop off the rails, bringing down certain track equipments, including the third rail and point machine. This caused a power fault that disrupted services between Jurong East and Bouna Vista, with shuttle train services commencing between Boon Lay and Jurong East, along with Bouna Vista and Queenstown at 5pm on the same day. On 30 September 2024, it was confirmed that the East-West Line would resume full operations on 1 October 2024 with speed restrictions (lasting for 3 days) along the westbound stretch between Dover and Clementi.
0:00 689/690 arriving
0:36 EW24/NS1 Jurong East
0:57 EW24/NS1 Jurong East » EW25 Chinese Garden
2:19 EW25 Chinese Garden
3:21 EW25 Chinese Garden » EW26 Lakeside
4:32 EW26 Lakeside
6:29 EW26 Lakeside » EW27 Boon Lay (Race with 841/842)
8:38 EW27 Boon Lay
9:16 689/690 departing

Опубликовано:

 

1 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии