140' streambank repair along a sewer easement. The slope was eroded after a severe rain event in 2019. Rock rip rap was proposed but the budget was exceeded by the cost of the rock. Flexamat Plus was chosen as the alternate. Five 16'x30' rolls of Flexamat was shingled downstream and anchored using percussion anchors to help stabilize the slope.
23 окт 2024