I've done this type of work all of my life and now i'm 71 and can only watch it on YOU TUBE but i still love it and truly do miss it , The dozer work that is
Congratulations ........ Very Nice Work Keep it up ........ Very Nice ... Very Wonderful ... Instrumen Very Interesting ... Very Greatful of flute Thank you so much Teacher ...... God bless you ... Thanks God Love ... Happy ........
there must be compensation for the total capacity of the sea or river that is lost due to landfilling of the sea or river, namely by making new ditches or dredging the river in accordance with the amount of capacity lost as a result of the stockpiling earlier, this must be done so that there is a natural balance
I noticed there was no explicit compacting process during this video...is the Compacting assumed to be implicit considering the heavy mobile equipment (The trucks and excavators)
This site has been heavily excavated previously. Water is moving because it is being displaced by road fill. The road is probably for access to more ground they can remove fill dirt from.
brasil e um aterro de verdade tem ser no minimo treis metro de altura com agila para ficar bom ne,a ajila na agua afunda fica cada vezes para aterra vai ter quefazer tudo denovo
@@bernardmichel4935 тогда вместо бульдозериста этим трактором должен управлять автопилот. Бульдозер совершает сложные маневры. Должен быть лазерный нивелир и геодезист (с GPS).
If you can't see flat then maybe you need more practice. The water is level, just stay 2 meters above that. It is more fun to watch them try and build a road with sand. This shot rock makes the job easy😎
@@donaldjordan8832 эту дамбу прокладывают только благодаря "глазомеру" бульдозериста? Я понял. Хотя бы поставили столб на другом берегу в точке, куда нужно прийти. Так было бы надёжнее.
The water was not stationary. As we look at the picture the water-mass on the left will rise now. The road needed large pipes burying under the stone to allow water to flow through and equalize height. Good bulldozer skills but very bad planning.
The channel should post a cost analysis video that tells us how many man hours, gallons of fuel used. Interview the driver and get the pros and cons of this job. Hoe much dirt was moved.
Estas obras pueden ver hiportates para mejorar los negocios y los afanes de oy en día pero donde queda el cuidado del medio aviente la destrucción d nuestro planeta es cada día más aselerado q le irá a quedar a nuestras descendencia Dios nos perdone el pensar solo en el momento y no en el mañana
I built the same kind of road using recycled concrete and a cat 977 tracked loader. Took a week but came out level and wide..it was fun operating that machine.
@shaddaimwananshiku1884 we had a sheep's foot compactor that compacted each lift. 3 2 foot lifts. that road was solid and will never have pot holes or cracks...compaction is the key for any roads or building or house pads..bad compaction is the reason for cracked or sunken foundation or roads..
Normalement il faut poser des grosses buses en béton sur le sol, ensuite, déverser le remblais au dessus pour permettre à l'eau de communiquer entre la partie droite et la partie gauche. Sinon, en cas d'inondation la nouvelle route sera inondée.
I noticed there was no explicit compacting process during this video...is the Compacting assumed to be implicit due to the movement of the heavy mobile equipment (The trucks and excavators)?
The trucks really are too close when dumping.at least 50 feet apart would be safer.just an old man sayin that after dumbing a hundred thousand times.but nice job tho