In a multiple tanks on site project, we construct multiple tanks at the same time on site. To do this, we use a central crane for the hoisting work, with different locations around the crane for the various production phases, thereby ensuring a smooth transition between processes.
Moving one large tank from the production hall to its final destination can prove to be an enormous challenge. Transporting a series of tanks is, therefore, even more of a challenge. Although many things are possible, constructing a tank in the production hall and transporting it is not always the most attractive option. If you’re having a series of tanks constructed, a multiple build project may be a sensible decision.

Опубликовано:

 

29 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 1   
@shanthakumarpandian8747
@shanthakumarpandian8747 Год назад
Great techniques and a very nice presentation about tank manufacturing and erection. Thanks a lot for sharing!
Далее
The Hose Clamp Story
22:38
Просмотров 94 тыс.
How did the Enigma Machine work?
19:26
Просмотров 10 млн
Tank 24 Demo & Construction
3:59
Просмотров 152 тыс.
Processing of a pharmaceutical tank
2:39
Просмотров 8 тыс.
How to Steam Turbine components work? Power Engineering
10:07