In a multiple tanks on site project, we construct multiple tanks at the same time on site. To do this, we use a central crane for the hoisting work, with different locations around the crane for the various production phases, thereby ensuring a smooth transition between processes.
Moving one large tank from the production hall to its final destination can prove to be an enormous challenge. Transporting a series of tanks is, therefore, even more of a challenge. Although many things are possible, constructing a tank in the production hall and transporting it is not always the most attractive option. If you’re having a series of tanks constructed, a multiple build project may be a sensible decision.