In this video we will learn how to configure GPON OLT in Plug & Play Mode. To get installation files or further assistance you can reach us at support@syrotech.com.
In netlink olt I want to configure as link redUdancy. 1st ge1 port connected through trunk onu. 2nd ge2 through wireless p2p link for backup, if trunk onu optical fiber breaks. Link need to shift on wireless. Suggest a configuration through video.
Its is not a plug and play device. I have my network upgraded from epon to gpon olt. All customers were pon registered but didnt get dialup established. New gpon olt requires configuration that can be done syrotech people only. which takes a lot o time.
I am also facing same issue. We can see all onu's registered on OLT but are not able to dial and get IP from mikrotik. General Routers working fine when connected to ONU in bridge mode. But no Onu is able to dial. We have two inputs in OLT without vlan working on service name technique (Last engineer set it all). Please share your experience how did you resolved it.
Model GOPON-2OLT Inband Management IP 192.168.1.120 Outband Management IP 192.168.120.100 but OLT not login show this Error This site can’t be reached192.168.1.120 took too long to respond. Try: Checking the connection Checking the proxy and the firewall Running Windows Network Diagnostics ERR_CONNECTION_TIMED_OUT This site can’t be reached192.168.120.100 took too long to respond. Try: Checking the connection Checking the proxy and the firewall Running Windows Network Diagnostics ERR_CONNECTION_TIMED_OUT