Cpc all link together from feed and to the loads, flylead to the grid yoke. Different grid switches have supply / load either top or bottome, but all labeled.
So ring L-N is linked along the bottom and the cable running to the actual appliance is in the top. I get you wouldn’t link the bottom If it wasn’t part of a ring there but there would be like 8 cables and would you have to separate the earths for each individual circuit and just fly lead of one of the wago/connector block. Iv Only done lighting grids before so still learning 😂
Thanks for the video, excellent. Can i ask on the load side are they still plugged into a socket or do you cut plug off and put stright into grid switch.