Тёмный

Hidden River Pathway Project interpretive sign 

BloomingtonParks
Подписаться 643
Просмотров 19
50% 1

The Hidden River Pathway Project is a two-year project launched by the City of Bloomington, Indiana Utilities Department in 2021. This significant project involved reconstruction downtown Bloomington stormwater infrastructure that prevents flooding during rain events. The playground at The Waldron, Hill and Buskirk Park was removed to facilitate the project, then replaced in 2022. An interpretive sign at the site details the nature of the stormwater culverts and the "hidden" Campus River.

Опубликовано:

 

9 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии