Тёмный

History of Tyne and Wear Metro - Documentary - The Way Ahead 

Views of Tyneside
Подписаться 642
Просмотров 43 тыс.
50% 1

Follow us on instagram:
/ viewsoftyneside
The Tyne and Wear Metro is an overground and underground light rail rapid transit system serving the metropolitan boroughs of Newcastle upon Tyne, Gateshead, North Tyneside, South Tyneside and the City of Sunderland (together forming Tyne and Wear).
The network opened in stages from August 1980 and now serves a total of 60 stations, with two lines covering 48.2 miles (77.6 km) of track.
In the early 1970s, the poor local transport system was identified as one of the main factors holding back the region's economy, and in 1971 a study was commissioned by the recently created Tyneside Passenger Transport Authority (now known as Nexus) into how the transport system could be improved. This study recommended reviving the badly run-down former Tyneside Electrics network by converting it into an electrified rapid transit system, which would include a new underground section to better serve the busy central areas of Newcastle and Gateshead.
The plans were approved by the Tyneside Metropolitan Railway Bill, which was passed by Parliament in July 1973.
Three railway lines, totalling 26 miles (42 km) were to be converted into Metro lines as part of the initial system - these being the North Tyneside Loop and Newcastle to South Shields branch (both of which were formerly part of the Tyneside Electrics network), and a short stretch of the freight-only Ponteland Railway between South Gosforth and Bank Foot, which had not seen any passenger traffic since 1929.
Construction work began in October 1974. This involved the construction of the new infrastructure, re-electrifying the routes with overhead line equipment, the upgrading or relocation of existing stations, and the construction of several new stations, some of which were underground. By 1984, the final cost of the project was £265 million (equivalent to £871 million in 2022).
The initial network opened August 7th 1980. The following year Queen Elizabeth II visited Tyneside and officially opened the Newcastle to Gateshead route. In 1984 the Heworth to South Shields line was completed. Two more stations were added in 1985, Kingston Park was officially opened on the 15th of September and Pelaw was opened the following day on the 16th.
Further extensions to the original network were opened in November 1991 (from Bank Foot to Airport) and March 2002 (from Pelaw to Sunderland and South Hylton).
Credits: John Woodvine (Narrator)
Organisations:
Tyne & Wear Passenger Transport Executive
Tyne & Wear County Council
Promotional film made by Turners Film and Video Productions

Опубликовано:

 

3 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 99   
Далее
Newcastle's Lost Neighbourhood of Scotswood
16:13
Просмотров 150 тыс.
Secrets of the Tyne & Wear Metro
10:54
Просмотров 693 тыс.
Учёные из Тринидад и Тобаго
00:23
КОГДА НАКРОШИЛ НА ПОЛ #shorts
00:19
Просмотров 855 тыс.
这位大哥以后恐怕都不敢再插队了吧…
00:16
Metro-Land: Revisited
19:52
Просмотров 26 тыс.
Tyne and Wear Metro: Clocking Up The Kilometres (1989)
19:48
What Happened to London’s Other Underground
15:10
Просмотров 96 тыс.
Newcastle's Lost Malls
24:56
Просмотров 94 тыс.
The Small Nordic City Where LRT Actually Works
12:49
Просмотров 233 тыс.
Wallsend Has SHOCKED Me As I Discover Its Secrets
20:24
Top 10 WEIRDEST Railways in the World
14:00
Просмотров 215 тыс.
The Architecture of The Tyne and Wear Metro
12:18
Просмотров 7 тыс.
The World's First Underground Railway
29:35
Просмотров 23 тыс.
Newcastle's Lost Character (Ian Nairn)
11:53
Просмотров 27 тыс.
Учёные из Тринидад и Тобаго
00:23