One of the by-products from Chornobyl NPP work is radioactive waste. The basis of waste management infrastructure at the power plant site are two facilities: industrial complex for solid RW management and liquid radwaste treatment plant.
The main objective of these two facilities is to prepare RW for disposal. Exactly, the waste is packaged into steel drums in which it will be ultimately disposed at specially designated sites within Exclusion Zone.
ChNPP manufactures all steel drums for own needs by itself. Our video shows all steps of the process from metal sheet to the final product.
19 сен 2023