Bored pile foundation is a foundation that is installed by drilling the soil with a certain diameter until it reaches a predetermined depth, then the assembled steel reinforcement is inserted into the drill hole and followed by filling the aggregate of concrete material into the hole. Bored pile is used if the work location has solid/stable soil properties so that it has a large bearing capacity with a depth of approximately 15 meters. Bored pile is very suitable to be used when there are many buildings around the location.
The carrying capacity of the bored pile is obtained from the end bearing capacity derived from the pile tip pressure and the friction bearing capacity derived from the friction bearing capacity or the adhesion force between the bored pile and the surrounding soil.
Pile foundations, including bored piles, are usually used on stable and rigid soils so that it is possible to form stable holes. If the soil contains water after the soil has been drilled with a drill, an iron pipe is needed to hold the hole wall and then the iron pipe is pulled up when placing the concrete. Whereas on hard soil or soft rock, the base of the pile can be made larger in order to increase the bearing resistance of the pile tip.
The types of bored pile foundations include:
-Straight bore pile for hard ground;
-Bored pile whose ends are enlarged in the form of a bell;
Bored pile whose ends are enlarged in the form of a trapezoid;
Bored pile straight for rocky soil.

Опубликовано:

 

20 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 48   
@bertojr1888
@bertojr1888 3 года назад
Makin mantap ni Chanel...👍
@mincemansaleolelet505
@mincemansaleolelet505 3 года назад
Mantap bang..semangat berkarya, 💪💪💪
@ilyasdgmanonpo6689
@ilyasdgmanonpo6689 3 года назад
Wow mantap banget bang hitungan nya semangat berkarya
@indroanugerah6692
@indroanugerah6692 3 года назад
Ngitungnya bener, tapi pelaksanaannya tidak seperti itu kaka', ambil contoh panjang tulangan utama 6.59m, 1staff panjang 12m, sisa potongan tinggal 5.41m, brarti harus nyambung, otomatis kebutuhan panjang besi bertambah 40d = 40 x 1.3cm = 52cm om.... perhitungan ini merugikan kontraktor, apalagi tidak dimasukkan unsur waste/material terbuang, kalo material disesuaikan dgn hitungan diatas, saya jamin jumlah besi tidak tercukupi
@altjetuwompalen8132
@altjetuwompalen8132 3 года назад
Good.. 👍👍
@aribudiman3228
@aribudiman3228 3 года назад
ijin sahre ya min
@rizkywahyunugraha9595
@rizkywahyunugraha9595 2 года назад
Terima kasih banyak, mas atas ilmu nya 🙏 Saya ingin bertanya, desain Bored pile untuk jalan tol itu bagaimana caranya, ya?
@TEMELTASCONSTRUCTION
@TEMELTASCONSTRUCTION 3 года назад
good work
@muhammadaziz5723
@muhammadaziz5723 5 месяцев назад
kalau perencanaan strukutur beton bertulang kolom spiral gimana pak
@arvinnurhidayat7927
@arvinnurhidayat7927 3 года назад
Kalau untuk bangunan 3 lantai, 1 pilecap berapa titik borepile bagusnya pak. Dan diameter juga kedalaman berapa. Besi tulang, pinggang dan sengkang diameter berapa
@abayupi5441
@abayupi5441 3 года назад
Tergantung jenis tanah dan besar n-spt atau sondirnya bro
@omlayahmad9853
@omlayahmad9853 3 года назад
Klo ga keberatan minta dong bang file excelnya.. trimks
@omlayahmad9853
@omlayahmad9853 3 года назад
Omlay9999@gmail.com
@suryatriadi5764
@suryatriadi5764 Год назад
Bisa minta excelnya kak ?
@mariapaulatoas8627
@mariapaulatoas8627 2 года назад
Gh
@bandonobondabandi186
@bandonobondabandi186 3 года назад
Bang..bisa dibagi filenya bang?😁 muhammadwatsiqfiddin@gmail.com Terima kasih banyak bang..🙏
@royalraflesia3
@royalraflesia3 3 года назад
bg mintk file ny bg kirim ke ucihadotobito@gmail.com ,makasi bg
@baabuljannah361
@baabuljannah361 3 года назад
Mantul....boleh share filenya bang sesesaiful@gmail.com
@yarofe1golan972
@yarofe1golan972 3 года назад
halo bg, boleh kah saya minta file nya ? kalo bisa krim ke email ku ya bg yarofenainggolan@gmail.com terimkasih bg
@lulukasrida7987
@lulukasrida7987 3 года назад
kak boleh dishare file excel nya....lulukasrida@gmail.com
@MrPink-kv5hc
@MrPink-kv5hc 3 года назад
mantap bang booeh minta filenya ga bang 🙏🏽 email saya : bayusbagu@gmail.com
@generalinformation1883
@generalinformation1883 3 года назад
bisa bantu share file nya please , syafiqakbarhafidz@gmail.com makasih sebelumnya
Далее
The REAL Truth Behind the DVD Logo
01:00
Просмотров 30 млн
Ребенок по калькуляции 😂
00:32
CARA MENGHITUNG BIAYA MATERIAL PONDASI RUMAH
7:26
Просмотров 19 тыс.
Metode Perakitan Besi Bored Pile
5:52
Просмотров 10 тыс.
how to calculate the need for paving blocks
7:26
Просмотров 2,6 тыс.
Perhitungan untuk mencari tonase pipa baja
4:24
Cara Menghitung Tulangan Bored pile
17:03
Просмотров 6 тыс.
The REAL Truth Behind the DVD Logo
01:00
Просмотров 30 млн