This video is about DIYing an integrated Seating SandBox. It was pretty easy and took me about 4-5 hours excluding buying the wood and getting it cutdown to the sizes. I would say it will take around 6 hours in total from Buying to Building.
Other stuff that i used for completing this project are
1. Weed Control Fabric
2. Play Sand
Tools Required
1. Driller
2. Driver
18 июн 2021