Here you learn the complete step follow and testing done during a Field Joint Coating for Pipeline work.
यहां आपको #पाइपलाइन के काम के लिए #फील्ड #जॉइंट #कोटिंग के दौरान किए गए संपूर्ण चरण का पालन और परीक्षण मिलता है।
Equipment Required for Blasting work -
1. Air compressor with Moisture separator.
2. Copper Slag/ Sand Blasting with hose pipe connected Nozzle.
3. LPG Burner, Hose pipe and LPG Cylinders.
Measuring and Test Equipments :-
1. Peel Gauge Tester. (Weight Balance for weight check while removing of peel)
2. Pyrometer/ Infrared Temp. Gun. (For Measuring temp of pipe surface)
3. Holiday Detector. (For Coating Damage Check)
4. Hygrometer(For Relative Humidity Check)
5. Coat meter / Elcometer (For Coating Sleeve Thickness Measurement)
6. Wet film thickness gauge (For Primer Thickness Measurement)
7. Roughness profile measuring (Styled) instrument. (For Surface Roughness Comparison)
8. Press O Film (Thickness 50µm for roughness impression on it)
9. Digital Micrometer (For Roughness measurement printed on Press-O-Film)
Note - All measuring and test Equipment shall be calibrated.
This video contain all step follow during Field Joint Coating of Pipeline :
1.Chamfering of 3LPE Coating at angle 30° with horizontal, 3LPE coating from Factory was chamfered at site.
2. Checking of Relative Humidity with Hygrometer. As per standard relative humidity is less than 85 %.
3. Blasting of Welded exposed Metal surface with Nozzle and sweep blast- 100 mm sleeve
overlap area on 3LPE mill coating.
4. After Blasting check for surface roughness with Press-O-Film which is 50-70 micron as per standard specification..
5. Dust Contamination check with Tape (As per ISO-8502-3) maximum allow rating is 2.
6. Pre-heat the surface before applying the epoxy primer. Pre-heat Temperature 60-70 ℃.
7. application of Epoxy Primer
Mixed epoxy primer Part A : Part B in ration of 3:1 mixing duration is 30-60 Sec.
Primer application only on steel surface.
8. check the primer thickness with the Wet Film Thickness Gauge. Primer thickness is greater than 200 microns.
9.Apply HTLP-80 sleeve on wet primer in Centre of weld joint. Sleeve overlap is at 10 or 2 O'clock.
10. Application of Closure Patch with inner preheating and apply roller by pressing over it or all over the surface of sleeve.
11. Holiday test at 15 kv for 12.75 inch pipe Diameter.
Visual Inspection :
* Adhesive flow evident over the entire circumference on both edges.
* Coating Sleeve free from Air Entrapments & Air Voids.
* Sleeve Surface free from Bums & Punctures.
cgd
pipe coating
gas pipe line
hdpe welding
pqr
Seal For Life HSS Field Presentation at Selam CGD Project
Testing the adhesion of a pipeline coating also know as "Peel Test"
How to avoid corrosion in underground-pipes by applying PVC-bitumen tapes
3 Layer Polyethylene Coating (3LPE) - Pipe Coating
Heat shrinkable sleeve for steel pipes
FRDP Dry Film Heat Shrink Sleeve Installation Guide
Heat Shrinkable wrap sleeves for Pipeline
3LPE Coating Pipe Process
How to avoid corrosion in underground-pipes by applying PVC-bitumen tapes
Pipeline Coating damage repair | Patch repair I 3LPE Coating
Pipeline Coating damage repair | Patch repair I 3LPE Coating
Joint coating of 12" 3LPE Product Pipeline (IOCL PAJPL-Una Branch Product Pipeline) (PB to HP, IN)

Наука

Опубликовано:

 

8 янв 2022

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 29   
@mubasheerhussain5787
@mubasheerhussain5787 Год назад
This video having so much content with serial wise 🔥 Thanks 🙏🙏🙏
@pipelinecgdnetwork1488
@pipelinecgdnetwork1488 Год назад
Thank you
@AkhtarAli-pw7wm
@AkhtarAli-pw7wm 2 года назад
Badhiya h learning ke liye
@sufiarustam4947
@sufiarustam4947 2 года назад
Nice 👍
@EntertainmentKibaatein
@EntertainmentKibaatein Год назад
THis video is very helpful.
@akashdiprajput2986
@akashdiprajput2986 Год назад
Knowledgeable 👌
@user-rd5er1ew7d
@user-rd5er1ew7d Год назад
Good Skill
@Proudtobeamuslimm
@Proudtobeamuslimm 2 года назад
Good information
@pipelinecgdnetwork1488
@pipelinecgdnetwork1488 Год назад
Thanks
@mdasif9935
@mdasif9935 2 года назад
Thank u brother.
@hmdyoutubechannel8796
@hmdyoutubechannel8796 Год назад
good jobs and subscribe
@ernofalurrea-gz2ww
@ernofalurrea-gz2ww Год назад
Instalando cannusa .esa técnica se usa en Colombia
@pipelinecgdnetwork1488
@pipelinecgdnetwork1488 Год назад
Ya we try to do it.
@johnzhang9537
@johnzhang9537 Год назад
Welcome to try TSD Brand HEAT SHRINKABLE SLEEVE.
@pipelinecgdnetwork1488
@pipelinecgdnetwork1488 Год назад
Ya try again later.
@rc7147
@rc7147 Год назад
Why we closed the sleeves at 10 or 2 o clock?
@pipelinecgdnetwork1488
@pipelinecgdnetwork1488 Год назад
It is safer to keep the closure patch of sleeve at 10 or 2 O'clock because During lowering of pipe the cradle it rolled over the pipe coating so there is no abrasion over the patch. Also their pipe seam is in 10 or 2 O'clock position welded in alternate manners.
@pankaj45673
@pankaj45673 2 года назад
Blasting should be done under closed by hood for safe purpose do not perform in open like this
@mdasif9935
@mdasif9935 2 года назад
5:13 me 50 mm overlap ka matalab kya ha ? HTLP 80 SLEEVE - 3LPE pr overlap hoga bothe pipe ke edge pr ?
@pipelinecgdnetwork1488
@pipelinecgdnetwork1488 2 года назад
Overlap HTLP-80 To company Coated (3LPE ) is 100 mm both side edge. But at below closure patch/Joint overlap of HTLP-80 is 50 mm.
@mdasif9935
@mdasif9935 2 года назад
@@pipelinecgdnetwork1488 thank you very much
@mdasif9935
@mdasif9935 2 года назад
Bhai haydro test ka full video daal dijiye
@pipelinecgdnetwork1488
@pipelinecgdnetwork1488 2 года назад
Yes sure I upload,but it's take time.
@user-qg9wk1jk4o
@user-qg9wk1jk4o Месяц назад
Make the Steel line full video, still commissioning .
@pipelinecgdnetwork1488
@pipelinecgdnetwork1488 Месяц назад
Sure sir 😊
@akhileshcomedy7076
@akhileshcomedy7076 2 года назад
Kam hai
@octafos
@octafos Год назад
koi team hai ye kaam krne ko ? hai to no. share karo
@pipelinecgdnetwork1488
@pipelinecgdnetwork1488 Год назад
Details send kre location salary etc
Далее
🛑 до конца!
00:12
Просмотров 81 тыс.
Seal for Life HSS Field Joint Coating
28:06
Просмотров 41 тыс.
Pipeline Hustle ✨in the field teamwork
38:41
Просмотров 99 тыс.
Pipeline Welding - A Day On The Hot Pass
14:03
Просмотров 2,5 млн
iPhone socket cleaning #Fixit
0:30
Просмотров 17 млн
Battery  low 🔋 🪫
0:10
Просмотров 13 млн