How to make RTR Pipe Assembly of Adhesive bonded joints? | TB/TS | TM/TF | Bell & Spigot Joints |
This video gives an impression of how an examination is performed according the DNV GL examination scheme for bonder, jointer, spoolbuilder or pipefitter. Assembly of the joints is checked against the manufacturers procedures during the exam. This has to be done correctly. The joint will be tested at 1,5 times design pressure for 4 hours no leaks allowed in the joint.