How to use PERT Method ? project management 

Engineer Boy Official
Подписаться 195 тыс.
Просмотров 104 тыс.
50% 1

Опубликовано:

 

27 июл 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 89   
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
I hate PERT because my teacher gave me 6/10 in it 😂. Do you like it?
@luxeyvevo3124
@luxeyvevo3124 2 года назад
Atleast you were given 6/10 mine gave me 2/10
@estersiahaan1248
@estersiahaan1248 11 месяцев назад
I do
@EngineerBoyOfficial
@EngineerBoyOfficial 11 месяцев назад
😲
@zubairkhan-xg8df
@zubairkhan-xg8df 3 года назад
Great Sir g..Keep it Up #chemistryunseen
@naeemullah3508
@naeemullah3508 3 года назад
Most useful lecture for project management. 👍👍👍👍 Thank you dear
@EngineerBoyOfficial
@EngineerBoyOfficial 3 года назад
Most welcome
@grandmasterbobo
@grandmasterbobo Год назад
Thank you Engineer boy, I got a 100% on homework assignment!!!
@EngineerBoyOfficial
@EngineerBoyOfficial Год назад
❤️
@kylechallis
@kylechallis 2 года назад
Great job! Perfect walk through, clear explanation, and made it very simple to understand. Thank you.
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
Thank you for visiting ❤️
@Big_Mo_Zak
@Big_Mo_Zak 2 года назад
Excellent 👏
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
Thank you for compliment
@mbongogeoffredtemmla8234
@mbongogeoffredtemmla8234 2 года назад
Appreciates your lecture engineer boy and clearly step by step guide for study 🤝🤝🤝🤝🤝
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
Thank you for visiting
@waseemsabir6962
@waseemsabir6962 3 года назад
weldone Salman Bhai... perfectly Explained
@EngineerBoyOfficial
@EngineerBoyOfficial 3 года назад
Enjoy bro ❤️🥰
@RuwanKarunanayake
@RuwanKarunanayake 11 месяцев назад
You are better than my teacher. Thank you very much.❤
@EngineerBoyOfficial
@EngineerBoyOfficial 10 месяцев назад
Thank you for watching me
@menchielegaspi1461
@menchielegaspi1461 3 года назад
well explained.thank you
@EngineerBoyOfficial
@EngineerBoyOfficial 3 года назад
Welcome infinite
@shahzamanali6598
@shahzamanali6598 4 месяца назад
Very useful and well explained lecture. Thanks for sharing sir.
@EngineerBoyOfficial
@EngineerBoyOfficial Месяц назад
welcome dear
@idmanmaxamed3246
@idmanmaxamed3246 2 года назад
thank you very much bro i understood each and every thing you said about this lucture i wish you and your be loved family happy and health life
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
❤️❤️❤️
@winplays4228
@winplays4228 2 года назад
best best best ,,, Thank you
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
Most welcome 🥰
@nimrarao4379
@nimrarao4379 Год назад
Thanks sooooo much .... very helpful lecture
@EngineerBoyOfficial
@EngineerBoyOfficial Год назад
Welcome
@shehzinazaib3151
@shehzinazaib3151 3 года назад
Very helping lecture 👍👍
@EngineerBoyOfficial
@EngineerBoyOfficial 3 года назад
Thank you infinite ❤️
@nanaefiaamponsahmensahmwam9512
@nanaefiaamponsahmensahmwam9512 11 месяцев назад
This is really useful and helpful thanks a lot!
@EngineerBoyOfficial
@EngineerBoyOfficial 11 месяцев назад
Glad it was helpful!
@fatimaikram2756
@fatimaikram2756 7 месяцев назад
Most useful
@EngineerBoyOfficial
@EngineerBoyOfficial 7 месяцев назад
Glad you think so!
@ANGAYARKANNI_A
@ANGAYARKANNI_A 2 года назад
thank you sir
@EngineerBoyOfficial
@EngineerBoyOfficial Месяц назад
you are most welcome
@Blissful8640
@Blissful8640 Год назад
Am a bit behind on the last part why 0.1 on the t tables when crossing changing probability?
@shangeetha6903
@shangeetha6903 Год назад
How did you get the checking project time?
@ziyayayaad
@ziyayayaad 3 месяца назад
very useful
@EngineerBoyOfficial
@EngineerBoyOfficial 2 месяца назад
Glad you think so!
@swathikarthikeyan1060
@swathikarthikeyan1060 2 года назад
How did u take checking project time as 32 days?
@narmadacharuni3394
@narmadacharuni3394 2 месяца назад
Thank you
@EngineerBoyOfficial
@EngineerBoyOfficial 2 месяца назад
You're welcome
@brocky
@brocky 2 года назад
what would the probability be if the question is asking for more than 35 days?
@ellysadatinguinoo152
@ellysadatinguinoo152 2 года назад
Hi. How did you get the checking project time?
@user-tg8db9nb9i
@user-tg8db9nb9i 10 месяцев назад
Yah I also have that doubt..
@user-pl8iv2qq1d
@user-pl8iv2qq1d 2 года назад
how can the worst case take less time than the most expected? (first row)
@andreikliop2938
@andreikliop2938 6 месяцев назад
Thanks!😁
@EngineerBoyOfficial
@EngineerBoyOfficial 6 месяцев назад
Welcome dear
@prabhjotsinghrana9020
@prabhjotsinghrana9020 2 года назад
Thanks for the video, but small mistake in task A time, where mean time is more than pessimistic time, which is incorrect.
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
Let me check. However focus on method/procedure.
@cherrymaenillas952
@cherrymaenillas952 2 года назад
Sir, how did you solved for the early and late for starting and finishing the project?
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
Watch part 1 of this video.
@dudley0007
@dudley0007 2 года назад
hi there, great video! Does Pert Analysis work if there is 1 person to do everything?
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
No. Because pert is three time estimation.
@habibaelshazley1911
@habibaelshazley1911 7 месяцев назад
I have a question considering the duration of each activity in the network. Do we use the mean time of the activity or the most-likely time??As my teacher in the college said that we use the most-likely time and I'm a bit confused.
@EngineerBoyOfficial
@EngineerBoyOfficial 7 месяцев назад
in PERT method, we use mean. in CPM we use Most likely
@Lntluanga
@Lntluanga 11 дней назад
How can the pessimistic time be less than the Optimistic time in column A
@rdi9344
@rdi9344 Месяц назад
Okay a bit late but what if my teacher's excersises bring out decimal days? Because I can't calculate 10,33333 days.
@tokyowiz
@tokyowiz 2 года назад
why you looked the 0.1 coloumn ? thanks
@titussingoyi4503
@titussingoyi4503 8 месяцев назад
Wondering too
@ashleynaidoo6907
@ashleynaidoo6907 Год назад
how do you calculate optimistic most likely and pesimistic times?
@EngineerBoyOfficial
@EngineerBoyOfficial Год назад
There are different techniques for this. Experts do this
@hello-iu6ht
@hello-iu6ht 10 месяцев назад
9:50 Are u sure that it's 2.61? I mean it's 2.6195, which should round up to 2.62
@musthafa_areekode
@musthafa_areekode 2 года назад
How you calculated checking project time?
@idmanmaxamed3246
@idmanmaxamed3246 2 года назад
its given '
@poppasmurf3670
@poppasmurf3670 2 года назад
If the mean time turn out to be a decimal should I use that or round it?
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
Use that because we are doing iterations here where rounding is not better
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
Pert example two is uploaded yesterday
@poppasmurf3670
@poppasmurf3670 2 года назад
@@EngineerBoyOfficial Okay thanks alot
@whatsnew2807
@whatsnew2807 Месяц назад
Hi!!! I want to ask a question. In network diagram at 3:24, you used mean time as duration of that activity. I am right...?
@EngineerBoyOfficial
@EngineerBoyOfficial Месяц назад
yes, you are
@whatsnew2807
@whatsnew2807 Месяц назад
@@EngineerBoyOfficial ok. Thanks a lot!!!🙂
@EngineerBoyOfficial
@EngineerBoyOfficial Месяц назад
@@whatsnew2807 welcome
@radjaafizaz4815
@radjaafizaz4815 3 месяца назад
Programme évolution an review technique
@kenbhho3486
@kenbhho3486 Месяц назад
I have a question for you can you please send me all the Z values which is given by your teacher 😂 because my teacher gives me only the half of the Probability values
@EngineerBoyOfficial
@EngineerBoyOfficial Месяц назад
whatsapp me
@FaisalKhan-tr8mp
@FaisalKhan-tr8mp Год назад
Manana sir g
@EngineerBoyOfficial
@EngineerBoyOfficial Год назад
Shukria
@samiullahawan1462
@samiullahawan1462 3 года назад
Once i asked you a question related to PERT and CPM but you didn't reply. I asked you on Facebook massager
@EngineerBoyOfficial
@EngineerBoyOfficial 3 года назад
Hi. Usually i reply to everyone and each comment. I have not seen your comment. You can ask again. Thanks
@JAIPRAKASH-jp3bn
@JAIPRAKASH-jp3bn 2 месяца назад
How 36 comes
@rohaanmohammad7799
@rohaanmohammad7799 Год назад
Good explanation. But do you mind loosing the accent?
@harshalthombre2532
@harshalthombre2532 2 года назад
what's with the fake accent!! So irritating.
@EngineerBoyOfficial
@EngineerBoyOfficial 2 года назад
Its not fake. Its pathan’s accent
@FaisalKhan-tr8mp
@FaisalKhan-tr8mp Год назад
thank you sir
@EngineerBoyOfficial
@EngineerBoyOfficial Год назад
Most welcome
@lindaallotey5916
@lindaallotey5916 Год назад
please with timing labelled A, M and B does A represent optimistic, M the most likely and B the pessimistic. If yes, then why is activity A most likely timing greater than the pessimistic timing that is B.
Далее
resource leveling in project management
25:07
Просмотров 24 тыс.
🎙СТРИМ на 4 МИЛЛИОНА🍋
3:12:45
Просмотров 1,3 млн
ML Was Hard Until I Learned These 5 Secrets!
13:11
Просмотров 249 тыс.
Earned value analysis worked example
10:32
Просмотров 491 тыс.
CPM and PERT
27:26
Просмотров 544 тыс.
Are YOU Using this Primavera P6 Float Paths Feature?
10:06