In 2014 MMC Diver secured the contract to remove all the old bag work and concrete repairs which were installed previously as attempts to prevent under scour from the listed bridge in Bournemouth and replace this with a more sustainable solution by using four large concrete mattresses upstream and four large concrete mattresses downstream.
15 сен 2015