Тёмный

Installing the Ground Surface 

Jim Barrett
Подписаться 159
Просмотров 206
50% 1

At last, I'm starting to make some progress on the layout itself. In this video I'll cover the first stages of putting down balsa for the ground cover around the paper mill.

Опубликовано:

 

18 май 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 6   
@Castlebank_Sidings
@Castlebank_Sidings 14 дней назад
Looking good mate
@jimbarrett1975
@jimbarrett1975 14 дней назад
Thank you! It's nice to start getting some ground on, I'm really looking forward to getting the final surface done, as well as the ballast. Need to start saving for a static grass applicator.
@thomasdecker7631
@thomasdecker7631 12 дней назад
Code 70? Code 75? The difference is a scale 7/16" ()11.5 mm). No one would ever know the difference without a depth mike. Looking good so far. Anxious to see the finished result.
@jimbarrett1975
@jimbarrett1975 12 дней назад
Thank for watching, and for your comment. The main difference between code 70 and 75 track is that the 75 is chaired (British) whilst the 70 is spiked (US), so the eagle-eyed might spot a chaired rail. For those layout it's not something I'll worry about too much! It is starting to look like I might have a finished result one day - doing these videos has definitely pushed me on to make progress.
@thomasdecker7631
@thomasdecker7631 12 дней назад
@@jimbarrett1975 Hmm... Concrete will hide a lot.
@jimbarrett1975
@jimbarrett1975 12 дней назад
@thomasdecker7631 yes, I think so. As long as I don't mention it on social media or anything, no one will know 🙂
Далее
GP15 Rebuild Pt 1
10:59
Просмотров 165
SITUATION IN FAST FOOD
00:19
Просмотров 3,5 млн
КИТАЕЦ ЗА 24 МИЛЛИОНА / РАЗГОН
1:10:06
Arrma Gorgon is a blast!
2:43
Просмотров 2
The station building takes shape.
16:21
Просмотров 388
GP15 Rebuild Pt 2 - Trucks
19:35
Просмотров 111
SW1500 New Project
4:54
Просмотров 256
EX CNJ RS3 ON CONRAIL LOCAL
1:33
Просмотров 478