Indiana Southern Railroad takes a loaded coal train from the Bear Run Mine to Duke Energy's new coal gasification plant at Edwardsport, IN. Video begins at Linton on the INRD RR then we stop at Bee Hunter where the train takes the connection track to ISRR rails. Next we catch it on the hill between Sandborn & Westphalia and finally watch as the train comes into Edwardsport where the crew ties it down. Duke has a switcher that takes cuts of the train into the plant for unloading.
25 окт 2024