An inspector wants a transition in a driveway because if we dwell the redwood, over time the redwood breaks in half. What is a transition in pavement? We use crushed limestone.
As per standard norm Expansion joints are commonly provided at an interval of 50 to 60m for slab laid in winter & 90 to120m for slab laid in summer. But design is provided by clients after detailed study of subgrade soil and various parameter .