A short walk-around video showing the entire layout benchwork and trackwork. Yes it is still a mess for sure, but trains are running again as a result of said mess. There is still plenty of work to be done, but for now, the trains traverse a folded dog bone style, single level track plan. The track plan incorporates two reverse loops to allow trains to easily reverse direction. The layout stretches 24 ft along one wall and 15-20 ft along the other wall.
10 сен 2024