Тёмный

let's check your work | When Installing a power supply | Altronix 24v Battery Backup 

Vision Guy
Подписаться 2,5 тыс.
Просмотров 8 тыс.
50% 1

it's common to get service calls about a power supply only to find that the installers didn't actually finish the installer years ago.
simple fix

Опубликовано:

 

22 сен 2021

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 6   
@charlesdickson1398
@charlesdickson1398 2 года назад
That is why you are supposed to connect the trouble outputs to something that can monitor the status of the power supply. Your trouble outputs in this video have nothing connected to them.
@lowvoltageghost888
@lowvoltageghost888 2 года назад
Good video.
@VisionGuy
@VisionGuy 2 года назад
Thank you. Please consider subscribing to help support the channel
@johncanfield270
@johncanfield270 2 года назад
Notice The three Led's on the board next to the AL600ULXB, shows Active AC (green) DC on (Red) BAT (Not illuminated) no battery connected, easy diagnostic...
@VisionGuy
@VisionGuy Год назад
I agree, if you're familiar with the power supply. Most technicians don't pay attention to those small details and just move on.
Далее
Installing a 12V UPS for access control system.
23:11
How I REDUCED my Control Panel Wiring TIME BY 31%
12:15
Cheapest 5kWh DIY Whole Home Battery Backup System
17:57
No Room In Electrical Panel - Quick Fix
7:21
Просмотров 1,2 млн
How to Wire a Linear Access Control System
15:42
Просмотров 59 тыс.
RELAY fundamentals | NEPPS
10:51
Просмотров 2,9 тыс.
Magnetic Lock Access Control Kit Wiring Instructions
9:19
Altronix nac power supply battery issue trouble.
2:12
Просмотров 1,3 тыс.