Session 3: Mechanical Seal Piping Plans of the Pump & Seal Reliability Webinar Series Stay in Touch: Website: www.cummins-wagner.com/state/... Linkedin: / siewert-equipment Facebook: / siewertequipment Twitter: / siewertequip
We have 3 pumps for hot water circulation at a copper smelter. For seal flushing, we have a heat exchanger.The common thing on all these pumps (new or refurbished ) is that when the pump is placed on standby, the mechanical seal starts to leak a few weeks into being installed. The leaks then affects the seal temperature, rising as high as 99 degrees in some cases. To protect the seal, we have 90 degrees as the alarm temperature and 100 degrees and the trip temperature. However, when the pump is in service (running/on duty), the seal temperate is usually between 35 to 50 degrees and the seal does not leak, usually just a drop every now and then. Why and how does this happen?
Hello Jay and thank you for watching. The Plan 62 is a Steam Quench on the atmospheric side of the seal. It’s used to remove solids build up like coking, or salting. The inlet should be on the top and the drain at the bottom, and YES the drain should always be left open. You can, and most people do, install a steam trap but make sure the maintenance is done on the tramp. If it plugs, the 62 will not work properly and you will fail the seal.
Oh I see what you’re asking, the short answer is No that port is not always plugged. That port is on the process side of the seal and can be lined up with any single seal flush plan that the seal requires, like 11 or 13. Typically you will see this called out on a spec sheet or described as: “Seal Flush Plan 11/62”.
53A we will have seal pot only along external pressure, but in 53B you have heat exchanger along with seal pot,the pressure of buffer fluid maintained by Accumulator..
@@satheeshkumar-mg6ru is the 53B more fragile to dirty fluid such as solid or sand compared to 53A? The pump installed in our facility has 53B seal type and the 1/2 inch flushing line between stuffing box and discharge head is frequently got burst eroded by the sand. I wonder if it can be solved by modify the sealing into 53A and permanently plug the flushing line.
The main difference between plan 53A and plan 53B both are pressured barier plan 53B can handle more pressure than Plan 53A . In plan 53 A manually feed nitrogen .where as in plan 53B acuumaltor and bladder make up line separately . Almost plan 53B works has stand alone unit . If plan 53B fails check the pressure of your process line . Consultant application engineer or system design engineer before changing any thing.
LPGs have higher vapor pressure meaning that your leakage will be gas and not liquid and gas tend to rise, therfore, the use of a plan 65 or B IS NOT recommended and useful.
Just my opinion, the pump discharge pressure is the same as the back casing where seal installed, because impeller accelerates fluid, you may look up how centrifugal pump works video made by engineering mindset!